1.
Construction area of Shaping hydropower station surge shaft is in mudstone geological zone.
沙坪水电站调压井工程施工区属泥岩地质带,为确保井筒开挖的施工质量和进度,以及为确保开挖围岩稳定、安全,对此泥岩构造特点与力学性征进行了分析,针对分析情况,确定了开挖施工程序和方案。
2)  Eping hydropower station
鄂坪水电站
1.
Research on long-term optimal dispatching of Eping hydropower station;
鄂坪水电站长期优化调度研究
3)  Dongping Hydropower Station
东坪水电站
1.
Impermeability Test of Concrete with Fly Ash & Its applicationin Dongping Hydropower Station;
东坪水电站粉煤灰混凝土的抗渗性试验与应用
4)  Sangping hydropower station
桑坪水电站
1.
For construction of surge tank of Sangping hydropower station, the stepping and self-drilling hollow grout injection anchor rods are used in fractured rock at high slope and shallow landslide, resulting in good consolidation and anchorage in the surrounding rock.
介绍了桑坪水电站调压井高边坡在破碎岩体中采用迈式自钻式中空注浆锚杆,对破碎岩体及浅层塌方体的围岩固结锚固技术起到了很好的效果,对加快施工进度、降低施工难度、提高经济效益等方面都起到了较好的作用,为相似地质条件下的水电工程施工提供了参考。
5)  Dongping hydropower station
洞坪水电站
1.
Production test of the foundation grout curtain for the double curvature dam of Dongping Hydropower Station;
洞坪水电站双曲拱坝基础帷幕灌浆生产性试验
2.
Automatic control of long-distance feeding for aggregate storage bin of batching plant on left-bank of Dongping Hydropower Station
洞坪水电站左岸搅拌楼骨料仓远距离进料自动控制
3.
The powerhouse system of Dongping Hydropower Station in Hubei Province is a structure of underground cavern,with the characteristics of complex structure,big construction disturbance,difficult construction field and traffic.
湖北洞坪水电站厂房系统为地下洞室结构,具有结构复杂、施工干扰大、施工场地及施工交通困难等特点。
6)  Siping hydropower station
寺坪水电站
1.
Grouting tests were carried out in accordance with the characteristics of the soft rock dam foundation at the Siping hydropower station to investigate effective methods and technologies for raising the grouting pressure in the treatment of soft rock da.
本次灌浆试验针对寺坪水电站大坝坝基软弱岩体的特殊性,研究及探索在中—弱透水性软弱岩层坝基处理中有效提高灌浆压力的方法和工艺。
2.
The height of face slab rock fill dam at Siping hydropower station is 90.
寺坪水电站面板堆石坝坝高90。
补充资料:沙姆霍尔水电站

沙姆霍尔水电站

Shamkhor Hydropower Station,Шамхорская  ГЭС


概  述

  沙姆霍尔水电站位于阿塞拜疆共和国库拉河(Кула)上。河床土坝最大坝高70.7m,坝顶长1800m;河滩地土坝最大坝高40m,坝顶长1900m。水电站装机容量38万kW,年发电量8.5亿kW·h。水库总库容27亿m3,有效库容14.25亿m3。该工程具有发电和灌溉等综合经济效益。工程于1983年竣工。水电站包括厂房、进水口、引水渠、两条水轮机压力钢管和尾水渠。水电站进水建筑物设有4孔进水口,其宽度各为10m,高20m,后接4条钢筋混凝土压力钢管。灌溉取水建筑物包括:3条钢筋混凝土引水管,总长126m,设有3个正方形引水孔,孔口边长2.5m,壁厚0.6m。