1) connection between the powerhouse and the dam
厂坝联结
2) discharge from surface-bottom outlet
厂坝联合
1.
On the basis of model test,a 2D numerical simulation on the flow field of discharge from surface-bottom outlet on low waterhead and big flux was made by adopting k-εturbulence model and VOF method.
在模型试验的基础上,应用k-ε紊流数值模型,采用VOF方法,对低水头大流量厂坝联合泄洪消能流场进行了二维数值模拟。
3) gap between dam and plant
厂坝联接
4) combined effects of powerhouse and dam
厂坝联合作用
1.
Static and dynamic anti-sliding stability of the powerhouse section of a gravity dam under combined effects of powerhouse and dam;
厂坝联合作用下重力坝厂房坝段静动抗滑稳定分析
5) Changba
厂坝
1.
2 in the Changba Pb-Zn ore dePosit.
厂坝铅锌矿床中钠长石岩的产状、常量元素、微量元素、稀土元素和放射性同位素等地质地球化学特征表明。
6) powerhouse dam section
厂房坝段
1.
Stress-strain analysis for powerhouse dam section of Tuka Hydropower Station;
土卡河水电站厂房坝段应力应变研究
2.
The reinforcement arrangement in the opening of diversion pipe in the powerhouse dam section of Three Gorges Project was calculated and studied by using the three dimensional non linear finite analysis method and taking the joint action of steel bar and concrete into account.
:采用三维非线性有限元分析方法 ,考虑钢筋和混凝土的联合作用 ,对三峡厂房坝段引水管道孔口配筋方案进行计算研究 ,求出了设计工况下引水管道孔口周围混凝土和钢筋的开裂和屈服范围。
补充资料:钢铁厂矿山利用尾矿筑尾矿坝
钢铁厂矿山利用尾矿筑尾矿坝
钢铁厂矿山利用尾矿筑尾矿坝
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条