1) single-span auxiliary girder
单孔便梁
1.
Further more,it is the first time to jack in a three-hole frame culvert below a single-span auxiliary girder.
介绍莘朱路下穿立交在地形复杂地段,有地铁、铁路、轻轨和小高层建筑物的影响下的施工技术,并且首次在单孔便梁下顶进三孔框架涵。
2) auxiliary girder
便梁
1.
Research on the safety of railway auxiliary girder when jacking method is used in construction;
顶进法施工时铁路便梁安全性试验研究
2.
In the extension and reconstruction of box culverts on operating lines,the flexible use of construction auxiliary girders and reasonable arrangement of work process play a key role in shortening the train speed restriction time,reducing as far as possible the disturbance of construction on operation and ensuring construction safety and engineering quality.
在营业线扩建、改建既有箱涵中,灵活使用施工便梁,合理安排工序,对于缩短列车限速时间、尽可能地减少施工对运输的干扰和确保施工安全,以及确保工程质量都起到关键作用。
3) temporary beam
便梁
1.
The technology of line reinforced by the temporary beam in the D pattern and container bridge jacking has been widely applied.
D型便梁加固线路顶进箱桥施工技术已得到广泛应用。
2.
The sped of train is limited to 45 km/h on the temporary beam aecording to the rule stipulated in "Rules of Railway Engineering and Maintenance Safety" , but in fact, the speed of train on the temporary beam is often increased to 60 km/h or more in order to reduce the influence on traffic by construction.
研究目的:D型施工便梁常作为一种临时结构加固既有线路,《铁路工务安全规则》中规定列车通过便梁时限速45 km/h,而实际上为减少施工对运输的干扰,往往需将限速值提高至60 km/h及以上。
3.
When the underpass bridge frame structure in the Ganlong Line from Ganzhou of Jiangxi province to Longyan of Fujian province below which is the Jingjiu Line is carried out with jack-in method, Jingjiu Line is supported by 6 pairs of temporary beams in the pattern of D16+ D24+ D16 to ensure the normal function of it.
江西赣州至福建龙岩(简称赣龙线)铁路下穿京九铁路的框架桥顶进施工时,采用四组D16和两组D24便梁加固线路,为了保证在整个施工过程中列车安全运行,最大限度减少施工对运输的干扰,提出在突破现行《铁路工务安全规则》规定限速45km/h的条件下提高行车速度,达到“双60”的要求。
4) transportation beam line
运梁便线
5) railway auxiliary beam
铁路便梁
6) modified auxiliary beam
改制便梁