说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 大孔板梁
1)  large hole slab beam
大孔板梁
1.
An analysis is made of controlling elements of main span, and a description is given about the selection of bridge types for the main span, and the design of large hole slab beam.
简述大孔板梁的设计过程 ,针对大孔板梁铰缝设置的特点 ,说明相关理论及设计计算过
2)  main girder
大板梁
1.
Discussion on Non-destructive Testing of MAIN GIRDER;
大型电站锅炉大板梁无损检测的探析
2.
Based on existing machinery and tools as well as the characteristics of the main girder, the author analyses the difficulties in lifting and mounting the main girder and proposes a load distribution scheme and a construction technique that covers the entire lifting process from unloading, turning over, hoist until being mounted.
根据现有机具和大板梁的特点,分析了吊装难点,提出了吊机的负荷分配方案和从卸车、梁体翻身、抬吊直至就位等吊装全过程的施工工艺。
3.
The finite element method and commercial software ANSYS are used to analyze the static characteristic of main girder of boiler steel frame structure,and the code for design of Steel Structures(GB50017-2003) are applied to check the analysis result.
大板梁是电厂锅炉钢结构中的主要受力构件,承担锅炉悬吊部分的竖向荷载。
3)  big board-beam
大板梁
1.
By analyzing the trait of big board-beam structure and the major factors that should be considered in hoisting installation,this paper introduces 10 methods of hoisting installation of big board-beam through 17 instances.
在分析大板梁结构特点、吊装方法应考虑的主要因素的基础上,通过17个实例介绍了大板梁吊装的10种方法,并对各种方法进行了剖析。
2.
Basing on analyzing the trait of big board-beam structure and the major factors should be considered on of hoisting installation methods,this paper introduces and anatomies 10 methods of hoisting installation of big board-beam trough 25 instances.
大板梁具有重量重、外形几何尺寸大、就位位置高的特点。
4)  Girder [英]['gɜ:də]  [美]['ɡədɚ]
大板梁
1.
Two kinds of girder supports in common use are analyzed, and a new girder support is put forward.
分析了两种常用的大板梁支座的特点,提出一种新支座形式。
2.
The point is discussed that lifting technique of establishment for boiler girder of 1 000 MW Supercritical coal-fired unit should lie on boiler main force lifting machine selected,boiler-type and girder designed characteristic,which will directly affect the whole project safety,quality and schedule.
阐述了1000MW超超临界燃煤机组锅炉大板梁吊装方案的制定,取决于锅炉主力吊装机械选择、炉型和大板梁的设计特点,直接影响到整个工程的安全、质量和进度。
5)  roof and beam
顶板大梁
1.
In the hoisting of steel roof and beam for 2×350MW over-critical mechanical unit No.
在江西华能瑞金电厂2×350MW超临界机组2号锅炉钢结构顶板大梁吊装中,顶板大梁共有5根,编号分别为A、B、C、D、E,其中A、B、E三根梁采取一台吊车独立吊装;C、D两根梁因单重超过最大起重机械额定负荷50t,采取FZQ1250与80t滑车组抬吊,D梁在炉顶通过小坦克平移就位,C梁直接抬吊就位。
6)  web of girder
大梁腹板
补充资料:梁大壮大观舞歌 大壮舞歌
【诗文】:
高高在上。
实爱斯人。
眷求圣德。
大拯彝伦。
率土方燎。
如火在薪。
惵惵黔首。
暮不及晨。
朱光启耀。
兆发穹旻。
我皇郁起。
龙跃汉津。
言届牧野。
电激雷震。
阙巩之甲。
彭濮之人。
或貔或武。
漂杵浮轮。
我邦虽旧。
其命维新。
六伐乃止。
七德必陈。
君临万国。
遂抚八寅。



【注释】:



【出处】:
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条