说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 放线施工
1)  wire stringing construction
放线施工
2)  construction Actinomyces
施工放线
1.
This paper fully illustrated that the use of Total Station brings out efficience,expeditiousness and flexibility in large- scale projects by introducing the method of Foundation Engineering construction Actinomyces which was used in Qinhuangdao Olympic Sports Center Stadium pile constructio
通过秦皇岛市奥体中心体育场桩基工程施工放线的方法,充分说明了在大型工程中利用全站仪放线的高效,快速,灵活。
3)  cable unwinding construction of overhead catenary
接触网放线施工
4)  setting-out survey
施工放样
1.
This article unifies the examples to introduce the application of AutoCAD technology for the material computation and the setting-out survey in the project survey.
结合实例介绍AutoCAD技术在工程测量中内业资料计算及施工放样测量中的应用。
5)  construction setting-out
施工放样
1.
Laying off curve is the primary content of the technique design and construction setting-out in the linear engineering,for instance highway、railway、pieline and so on,and it is the primary competent of engineering surveyor in everyday work.
曲线测设是公路、铁路、管线等线状工程技术设计、施工放样的主要内容之一,是工程测量人员日常工作的主要组成部分,曲线放样数据计算的方法多种多样,本文主要讨论曲线放样数据计算的几种常用方法,并比较其特点及各自适用条件。
2.
Taking the control network of Zhanghewan Pumped Storage Power Station for example,the comparative calculation is made;and the construction setting-out and measurement method for the complex form and structure with multi.
讨论了多线型、多曲面复杂形体的施工放样和计量方法。
3.
After the application of GPS static survey and total-station instrument in the construction setting-out of bridge in Hangzhou gulf,it can be concluded that this method can guarantee the speech and accur.
由于海上施工放样的特殊性,在针对远洋工程施工的特点和技术要求的基础上,进行了施工放样方案选择和精度分析。
6)  construction lofting
施工放样
1.
Discussion on the truncated cone banking construction lofting and quantity calculation;
锥坡施工放样与工程量计算的探讨
2.
It is important that useing the total station instrument to intravers servey, topographic servey, construction lofting and so on.
如发挥全站仪的优势,在导线测量、地形测量、施工放样诸方面可起到非常好的作用,其应用前景是很可观的。
补充资料:放线验线应注意哪些事项

放线验线时应注意以下五点注意事项:
1、先放线后验线。应当坚持先放线后验线的程序。一般建设工程项目可按照周围的参照物,由施工单位放线,施工放线后,建设单位向城市规划行政主管部门申请验线并报形式日期,城市规划行政主管部门的管理人员到现场验门的勘测队伍进行放线,放线后经规划管理人员验线。
2、作好放线验线记录。无论由谁放线、验线、都必须作好放线、验线记录。
3、在放线的过程中,对验线时需要查验的关键点必须打上固定标志。
4、放线时,原地上需要拆除的建筑物、构筑物应当全部拆除掉。
5、地形复杂的用地,应平整后再放线。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条