说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 放线施工
1.
Conductor Tension Stringing Construction Technology of Eight-Bundle for 1000 kV EHV Transmission Line
1000kV特高压线路八分裂导线张力放线施工技术
2.
Quality Problem Analysis and Countermeasures on the Tension String Construction of 750kV Pingqian Transmission Line
750kV平乾线张力放线施工中质量问题分析及对策
3.
Construction Methods on Pulling New Conductor Utilizing Old Conductor on Transmission Line Rush Repairs
线路抢修中利用旧导线牵放新导线的施工方法
4.
Research of Underwater Construction of Pile Cap of Zhujiang River Bridge in Guangzhou-Foshan Radiation Exit Line
广佛出口放射线珠江大桥水中承台施工研究
5.
Discussion on the programmable calculator application in construction setting out
论可编程计算器在施工测量放线中的应用
6.
FORMULATION AND PRACTICE OF STANDARDS FOR RADIATION PROTECTION OF γ-RAY INDUSTRIAL COMPUTED TOMOGRAPHY
γ射线工业CT放射卫生防护标准的制定及实施
7.
Cause of the protrusion of the cable inner end duringpayoff and solution to the problem
施工放线时线缆内端头子外伸原因及其解决方法
8.
gas-discharge duplexer
气体放电天线双工器
9.
Construction Technology Investigation of Subgrade Engineering for Special Railway Passenger Transport Line;
铁路客运专线路基工程施工工艺研究
10.
The research of the application of GPS RPS RTK in engineering Construction layout
GPS RTK在工程施工放样中的应用研究
11.
Technical specification for construction of cross power transmission line in installing the conductor
跨越电力线路架线施工规程
12.
Study on the Jacking Force Induced by Linear and Curved Pipe Jacking Construction;
直线及曲线顶管施工中的顶推力研究
13.
Key Construction Techniques on Fly-over Continuous Box Girder on Passenger Dedicated Line
客运专线跨线连续箱梁施工关键技术
14.
Stringing Construction of GTACSR288 Gapped Heat Resistant Up-Rating Conductor
GTACSR288间隙型耐热倍容量导线的架线施工
15.
Construction Schedule Planning and Control Based On Line-of-Balance In Construction;
基于平衡线的施工管理方法在施工中应用
16.
Constructing Method of Crossing over 110kV Baoyin and Tianwu Transmission Line without Power Interruption
不停电跨越110kV保阴线、天五线架线施工方法
17.
Structural Construction of Trial Operation Line for Urban Monorail Passenger Train
城市单轨客车试车线工程的结构施工
18.
CONSTRUCTION INSTALLATION AND ADJUSTMENT OF CHORD ARROW TRAVERSE FOR GEHEYAN HYDROPOWER PROJECT
隔河岩工程弦矢导线施工及安装调试