1) Model for single debris flow risk assessment
单沟泥石流风险评价模型
2) debris flow risk assessment
泥石流风险评价
1.
The article conducts a risk assessment on debris flow in Luoyugou of Tianshui City,Gansu Province using the risk hazard calculation method in single debris flow risk assessment model.
文章引用单沟泥石流风险评价模型中危害度的计算方法,对罗玉沟流域可能发生泥石流的概率进行了评价;潜在的经济损失主要从人员社会、物质和资源环境3大类进行评价。
3) risk assessment model
风险评价模型
1.
On the basis of the feature that the calculated parameter of Predicting Subsidence in Dewatered Cohesive Soil is adapt to interval analysis theory,the risk assessment model and two risk assessment indexes of satisfying different needs were established by using interval theory.
本文基于粘性土降水沉降量计算参数符合区间分析的特点,采用区间理论建立风险评价模型和满足不同需要的两个风险评价指标。
2.
Secondly,a trained ANN can endue risk assessment model with expert assessment knowledge in the way of joint weight through its learning and adapting capability.
首先论文在构建IT项目风险评价体系的基础上,提出一种基于人工神经网络的多指标综合风险评价模型。
3.
And on this basis , takes into a new construction risk assessment model with three major characteristics:probability,loss and controllability.
首先,根据国内地铁建设的现状侧面,阐述施工风险研究的必要性;其次,结合近年来地铁施工事故的分析,说明WBS-RBS结构分解的具体过程,并在此基础上提出兼顾概率、损失、可控性三大特征的地铁施工风险评价模型;最后,介绍了如何运用AHP方法确定WBS结构之间的权重关系,以及简化F-ANP方法确定RBS结构之间的权重关系,对传统计算方法进行了一定的创新与改进。
4) risk evaluation model
风险评价模型
1.
Regarding the start process,plan process,carry out process,control process,end process and item comprehensive management ability of software project as six risk factors,this paper proposes a risk evaluation model,and 78 risk indexes are summarized.
以软件项目的启动过程、计划过程、执行过程、控制过程、收尾过程和项目综合管理能力作为六个风险因子,提出了一个风险评价模型,总结了78个风险指标,依据模型计算出各种风险对进度、成本、范围和质量的综合影响。
2.
An improved risk evaluation model in software project investment is presented.
提出一种改进的软件项目投资风险评价模型。
3.
A risk evaluation model in software project investment based on Bayesian Networks(BNs) is presented in this paper.
提出了一种基于贝叶斯网络的软件项目投资风险评价模型。
5) site-specific debris flow
单沟泥石流
补充资料:定量风险评价
定量风险评价
[定量风险评价】“定量分析”。又称“定量分析”。参见
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条