1) power plant capital construction
电厂基建
1.
Aiming to the caisson construction on beach hydraulic fill yard,which is construction difficulty in the process of coastal power plant capital construction,the article validates the correctness and security of the algorithm, through theoretical calculation and material implement of caisson construction on the beach hydraulic fill sand yard which is in Qinzou coal fired Power Plant.
针对海滩吹填场地上的沉井施工这一沿海电厂基建过程中的施工难点,通过对钦州燃煤电厂海滩吹填砂场地岸边沉井施工的理论计算和具体实施,从潮位变化、地下水位变化、软土固结、地基强度指标等各方面验证了计算的正确性、安全性,并获得了施工工期和质量方面的成果。
2) preparatory work for building power station
电厂筹建
6) workshop building of power plant
电厂厂房建筑
补充资料:IGCC电厂(见整体煤气化联合循环电厂)
IGCC电厂(见整体煤气化联合循环电厂)
Aintegrated gasification combined cycle plant
IGCC电厂bined eyele(integrated gasifieationConl一plant)见整体煤气化联合循环电厂。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条