1.
Present situation and development suggestions of EPP in Zhenjiang city
镇江市能效电厂建设现状及发展建议
2.
Inquisition into Application of Mirror Surface Concrete in Electric Power Construction
镜面混凝土在电厂建设中的应用探讨
3.
The Project Post-evaluation for Hebi Power Plant;
鹤壁万和火力发电厂建设项目后评价
4.
EPC Approach in the Gas Fired Combined Cycle Power Project;
项目总承包在燃机电厂建设中的运用
5.
Several Links to be Enhanced in Construction Management of Thermal Power Plants;
电厂建设管理中应加强的几个环节
6.
Computerized Project Management Information System for Power Plant Construction Period;
电厂建设期计算机项目管理信息系统
7.
Research on the Cost Control of JiangShu ShaZhou Power Plant Construction
江苏沙洲电厂建设项目成本控制研究
8.
APPLICATION OF EMULATION TECHNOLOGY IN CONSTRUCTION PROJECT OF THERMAL POWER PLANTS
仿真技术在火电厂建设工程中的应用
9.
Quality Control of Thermal Power Plant Construction--Taking Xuangang Thermal Power Plant in Shanxi for Example
电厂建设施工的质量控制——以山西轩岗电厂为例
10.
Yinchuan Cogeneration Power Plant construction and Ningxia CHP market potentiality
银川热电厂建设和宁夏热电联产的市场潜力
11.
Researches on Constructing Efficiency Power Plant by Strengthening Management on Power Supply Side
基于加强电源侧管理的能效电厂建设研究
12.
Research on Ecological Green Land Construction in Power Plant--Taking Turpan Power Plant as an Example
火电厂生态绿地建设研究——以吐鲁番火电厂为例
13.
Energy-efficient design for power plant buildings in severe cold region
严寒地区电厂建筑节能设计——神华胜利发电厂建筑节能设计实践
14.
Application and development of architecture 3D design of main power building construction for thermal power plants
火电厂主厂房建筑三维设计应用与开发
15.
Outside Beijing, several power plants will be built such as Wangtan Power Plant (phase I), Zhenglangi Power Plant (phase I) and Daihai Power Plant (phase I) in Inner Mongolia, and Xiahuayuan Power Plant (phase VI).
在北京境外建设王滩电厂一期、内蒙古正蓝电厂一期、内蒙古岱海电厂一期、下花园电厂六期工程。
16.
Standard for design of architectural finishing of fuel power plants
火力发电厂建筑装修设计标准
17.
Specification for design of building of fossil fuel power plants
火力发电厂建筑设计规程
18.
Inquire into Information Construction Scheme Selection in Power Plant
火电厂信息化建设的方案选择探讨