1)  sequence construction method
跳仓法
1.
By the analysis,it can be found that the cracks can be well controlled by the appliance of sequence construction method and so on.
通过优化混凝土配合比,采取"跳仓法"等施工温控抗裂技术措施,同时对超长地下工程大体积混凝土顶板进行全龄期水化热温度在线监测及分析,成功控制了混凝土水化热温度和内表温差,有效抑制了大体积混凝土水化热温度引起的裂缝,分析表明本工程采用的温控抗裂技术较为有效。
2)  sequence construction
跳仓
3)  concreting sequencing
跳仓排序
1.
A new approach of concreting sequencing for dam construction based on fuzzy rule was proposed.
大坝混凝土施工跳仓排序受诸多约束条件的限制,同时遵从一定的施工原则,在施工过程中具有很强的随机性和不确定性。
4)  sequence placement
跳仓浇筑
1.
In this paper,a method of combining simulation computation program studied by independence with finite element calculation software is used to settle the difficulty in simulating three dimensional concrete sequence placement in complex mass hydraulic structure such as hydropower plant.
采用大型有限元计算软件与自主开发温度场仿真程序相结合,对某水电站厂房依照实际浇筑过程进行了温度场仿真分析,解决了仿真计算中混凝土跳仓浇筑的困难,通过与以前方案比较,说明浇筑方案对厂房温度场分布有较大影响,设计时可选择施工方案来降低温度。
2.
Therefore, a new function of three dimensional concrete sequence placement calculating method is added to FZFX3D - a software to simulate the dam construction process.
与传统意义上的施工仿真计算相对应 ,提出了大坝混凝土施工实时仿真计算的概念 ,完成了相应于混凝土施工三维跳仓浇筑仿真计算程序的开发 ,并将其应用于三峡大坝左厂9#坝段的仿真计算 。
5)  selection of blocks to be concreted
跳仓选块
6)  pouring by seperate strips
跳仓浇注