1) Scrunch numbers of test section
试件碾压次数
2) rolling frequency
碾压次数
1.
This paper introduces an approach of calculating the rolling frequency of vibrating rollers with mathematics method and based on energy theory and in accordance with the vibrating rollerearthwork system dynamics model.
介绍了一种以能量原理为基础,根据振动压路机—土体系统动力学模型,运用数学方法求振动压路机碾压次数的方法,结合工程实例,现场实测结果表明,理论计算的碾压次数与实际相一致,确定路基振动碾压次数的新方法是可行的,为施工单位确定压路机的振动碾压次数提供参考。
3) re-crush
二次碾压
1.
In recent years,the most attractive phenomenon in traffic accidents is "re-crush",which causes extensive and heated discussion in a society.
近年来,交通事故不断增多,其中最引人关注的是"二次碾压"。
4) roller compaction test
碾压试验
1.
According to the result of roller compaction test, points of construction of stabilized soft clay with lime are discussed.
在论述石灰稳定土加固机理的基础上,结合现场风干堆积软粘土和石灰稳定软粘土的碾压试验结果,阐述了软粘土和石灰稳定软粘土的性状,同时,提出了石灰稳定软粘土的施工要点及施工质量控制。
2.
The quality,the difficulty and the cost of roller compaction of concrete face rockfill dam(CFRD) is directly affected by the choice of roller compaction parameters,reasonable roller compaction parameters should be chosen through in-situ roller compaction test before CFRD construction,and design controlling index of compaction is checked.
大坝填筑施工前必须进行现场碾压试验以确定合理的碾压参数,并对设计控制标准进行复核。
5) compaction test
碾压试验
1.
Large-scale compaction tests have been carried out and compared with design compacted standards before embankment in order to ensure embankment parameter for dam construction.
盘石头水库面板堆石坝,在填筑前进行了大型碾压试验,复核设计压实标准,确定各区筑坝材料的填筑参数,供坝体施工采用。
6) rolling experiment
碾压试验
1.
Productive rolling experiment on material from excavated debris for construction of Dalong Earth-rock Fill Dam;
大隆水利枢纽土石坝石渣料现场生产性碾压试验
补充资料:福建省第二座碾压混凝土坝——龙门滩一级水库
福建省第二座碾压混凝土坝——龙门滩一级水库
目 福建省第二座碾压混凝土坝— 龙门滩一级水库
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条