说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 堆石料碾压试验
1)  rockfill RCC test
堆石料碾压试验
2)  roller compaction test
碾压试验
1.
According to the result of roller compaction test, points of construction of stabilized soft clay with lime are discussed.
在论述石灰稳定土加固机理的基础上,结合现场风干堆积软粘土和石灰稳定软粘土的碾压试验结果,阐述了软粘土和石灰稳定软粘土的性状,同时,提出了石灰稳定软粘土的施工要点及施工质量控制。
2.
The quality,the difficulty and the cost of roller compaction of concrete face rockfill dam(CFRD) is directly affected by the choice of roller compaction parameters,reasonable roller compaction parameters should be chosen through in-situ roller compaction test before CFRD construction,and design controlling index of compaction is checked.
大坝填筑施工前必须进行现场碾压试验以确定合理的碾压参数,并对设计控制标准进行复核。
3)  compaction test
碾压试验
1.
Large-scale compaction tests have been carried out and compared with design compacted standards before embankment in order to ensure embankment parameter for dam construction.
盘石头水库面板堆石坝,在填筑前进行了大型碾压试验,复核设计压实标准,确定各区筑坝材料的填筑参数,供坝体施工采用。
4)  rolling experiment
碾压试验
1.
Productive rolling experiment on material from excavated debris for construction of Dalong Earth-rock Fill Dam;
大隆水利枢纽土石坝石渣料现场生产性碾压试验
5)  compacting test
碾压试验
1.
Based on the actual engineering an introduction is made on the methods and experience to gain the maximum dry density of fill whose grain size exceeds 60mm under the condition of optimum water content by compacting test.
结合具体工程实例,介绍对回填料粒径>60mm的回填土采取碾压试验求取最优含水量状态下的最大干密度的方法和经验。
6)  rolled rockfill dam
碾压堆石坝
补充资料:福建省第二座碾压混凝土坝——龙门滩一级水库


福建省第二座碾压混凝土坝——龙门滩一级水库


目 福建省第二座碾压混凝土坝— 龙门滩一级水库
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条