1) roadway worksite
占道施工区
1.
The analysis and research of countermeasures to improve traffic safety at roadway worksite;
占道施工区交通安全分析与对策研究
2) occupying-road construction
占道施工
1.
The great influence of the urban project occupying-road construction on the traffic strictly affects the trip of the people.
城市建设项目占道施工对交通影响很大,严重影响居民出行。
3) Tunnel constructing area
隧道施工区
4) the fabrication based on the area divided
按管道分区块施工
1.
This paper describes two piping fabrication methods,that is,the fabrication based on the service system and the fabrication based on the area divided.
结合目前两种平台管线施工方式,印按管线系统施工与按管道分区块施工方式,分别以加工设计阶段和施工阶段进行比较、讨论;并得出:按管道分区块施工比按管线系统施工具有更多优势,生产过程具有整体性和均衡性,从而达到充分利用空间、缩短工期的目的。
5) Tunneling
[英]['tʌnəlɪŋ] [美]['tʌnəlɪŋ]
隧道施工
1.
Application of image method in calculating tunneling-induced soil displacement;
镜像法在隧道施工土体位移计算中的应用
2.
Geological forecast beforehand tunneling of Goumowan;
新建狗磨湾隧道施工超前地质预报
3.
Tamping tube curtain method is a new tunneling metho d.
夯管帷幕施工工法是一种全新的隧道施工工法。
6) tunnel construction
巷道施工
1.
Application of injector method in tunnel construction;
注浆法在巷道施工中的应用
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条