1) construction road
施工道路
1.
Dumpling piles and construction roads are the main sources of soil and water loss.
针对水电站建设施工特点和人为水土流失特点,指出"三通一平"阶段和大坝浇筑前是水土流失的重要时段,弃渣场和施工道路是水土流失的关键部位。
2) road construction
道路施工
1.
Design method of key structure parameters of broaden chippings distributor used in road construction;
道路施工宽幅碎石布料器关键结构参数设计方法
2.
Betimes character of detection in road construction;
浅谈道路施工检测的及时性
3.
Aiming at present status quo in which the road measurement is asynchronous with construction and based on the technical features of auto-tracking and dynamic measuring by measuring robot,this paper suggests the principle and method of dynamic control for road construction via measuring robot.
针对目前道路测量与施工不同步的现状,根据测量机器人自动跟踪动态测量的技术特点,提出利用测量机器人进行道路施工动态控制原理的方法。
4) highway construction
道路施工
1.
Integration system of setting out for highway construction based on components;
基于部件的道路施工放样集成系统
2.
The measurement is a fundamental work in the highway construction.
道路施工测量是建筑施工中一项基础性工作。
5) construction road
施工用道路
6) Road Under Rrepair.
道路施工中。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条