1)  auxiliary tunnel at Jinping hydropower station
锦屏电站辅助洞
2)  Jinping auxiliary tunnel
锦屏辅助洞
1.
The Jinping auxiliary tunnels(2×17.
5 km的锦屏辅助洞是联系锦屏一、二级水电站的交通洞,也是锦屏二级水电站引水隧洞施工的超前地质勘探洞和施工辅助洞。
2.
Due to the extremely deep cover,rock bursts occur frequently during the construction of Jinping auxiliary tunnel,which has seriously delayed the construction schedule and jeopardized the safety of the workers and equipment.
锦屏辅助洞为超深埋交通隧洞,在施工过程中岩爆频繁发生,严重影响施工进度,极大地威胁着施工人员和设备的安全。
3.
Combined with the practice of geological prediction of jinping auxiliary tunnel construction,this paper expounds the purposes,methods and principles,analyses and compares the working principle of several prediction methods,the scope and the advantages and disadvantages,which aims to provide the reference for the same kind of tunnels.
结合锦屏辅助洞施工过程中的超前地质预报实践,着重阐述了深埋特长隧道超前地质预报的目的、方法和原则,分析比较了几种主要超前预报方法的工作原理、适用范围和优缺点,旨在为深埋特长隧道施工超前地质预报提供借鉴。
3)  auxiliary tunnel of Jingpin Hydropower Pivot on the Yalangjiang River
雅砻江锦屏水电枢纽辅助洞
4)  flood-discharging tunnel at Jinping First Stage Hydropower Station
锦屏一级水电站泄洪洞
5)  Jinping Hydropower Station
锦屏电站
1.
Study on RC Lining and Interaction between Lining and Surrounding Rock of Left Spillway Tunnel at Jinping Hydropower Station;
锦屏电站左岸导流洞衬砌及其与洞壁围岩间相互作用研究
2.
Application of Construction Technology in Fault Fracture Zones in Dapingzi Highway Tunnelfor Jinping Hydropower Station;
断层破碎带施工技术在锦屏电站专用公路大坪子隧道施工中的运用
6)  JinPing hydro-power station
锦屏电站
1.
A typical section(K0+515m) of left spillway tunnel of JinPing hydro-power station is modeled in detail considering joint distribution using non-linear finite element method.
本文采用非线性弹塑性有限元法,对锦屏电站左岸导流洞塌方洞段的典型剖面K0+515m进行了精细模拟,研究了开挖过程中不支护与支护后洞周围岩应力应变分布及变化规律、洞周边变形及洞周塑性破坏区范围的变化,分析了局部洞段围岩失稳的成因,结果表明高地应力、洞周层面和裂隙及其特定组合是导致洞周局部不稳定的主要原因, 并预测了洞周可能存在的不稳定部位,进而对拟定的加强支护措施的有效性作出了评价,为支护的优化设计提供依据。
2.
A typical section(K0+434m) of left spillway tunnel of JinPing hydro-power station is modeled in detail considering joint distribution using non-linear finite element method.
本文采用非线性弹塑性有限元法,对锦屏电站左岸导流洞塌方洞段的典型剖面K0+434m进行了精细模拟,研究了开挖过程中不支护与支护后洞周围岩应力应变分布及变化规律、洞周边变形及洞周塑性破坏区范围的变化,分析了局部洞段围岩失稳的成因,结果表明高地应力、洞周层面和裂隙及其特定组合是导致洞周局部不稳定的主要原因, 并预测了洞周可能存在的不稳定部位,进而对拟定的加强支护措施的有效性作出了评价,为支护的优化设计提供依据。