说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 预控顶
1)  top pre-control
预控顶
1.
Aimed at the characteristics of ore body being unsteady and floodwater,the top pre-control substoping-cementation method was developed.
概述了莱芜矿业有限公司各矿床的水文地质条件、采矿方法沿革,针对矿体不稳固且水大的特点,研发了预控顶上向分段胶结充填采矿法。
2)  roof-control
顶板预控
3)  long-cable face roof pre-control
长锚索预控顶
1.
The application of the long-cable face roof pre-control technique in upward-route-cementation-filling mining method is briefly presented,the introduction of which effectively kept in check the inbreak of stope roof,together with the adoption of the upward-route-cementation-filling mining method,obtaining better mining effect and solving the problem of exploitation of dicky ore body.
简要介绍了长锚索预控顶技术在上向进路胶结充填采矿法的应用情况,通过采用长锚索预控顶支护技术,有效的控制了采场顶板冒落,配合上向进路胶结充填采矿法,取得了较好的采矿效果,解决了不稳固矿体的开采安全问题。
4)  Vertical Itemized back pretreatment
竖分条预控顶
1.
Thus,the Vertical Itemized back pretreatment medium-length hole throwing blasting spacing cementation filling method will be adopted,and the paper provided a detailed analysis and research on this method.
为此,准备采用竖分条预控顶中深孔抛掷爆破空场嗣后间隔胶结充填采矿法,本文对此进行详细地分析研究。
5)  initial shore-up
预顶
6)  Fully pre controlled roof room pillar mining method
全面预控顶房柱法
1.
Fully pre controlled roof room pillar mining method that is suitable for mining this sectional orebody in highlighted in the paper.
根据侯庄矿区难采矿体—第四系缓倾斜中厚矿体的地质、水文特点以及侯庄分矿采矿生产现状 ,对其进行采矿方法的初步研究 ,重点介绍了适应此段矿体开采特点的全面预控顶房柱
补充资料:可控性与非可控性投入


可控性与非可控性投入


可控性与非可控性投人可控性投入指学校和教育行政部门可以控制的教育资源投入。学校可以对教学负担、班级规模、课程教学单元的数量、每个教师承担的学科教学任务的平均量等可控性投入进行调节和平衡,以改进教学质量。教育行政部门可以对教师的专业准备程度、教学经验、培训要求、教师工资、设备供应、生活费用、图书馆藏书等投入进行选择,以调节教育的供给与需求。而非可控性投入指学校和教育行政部门不能控制的教育资源投入。如学生的种族、性别、年龄及家长的社会经济背景等无法控制的因素对教育有着不同程度的影响。教育部门不能控制学生家长的教育水平和收入状况,但应当推动教育机会平等的社会经济环境的实现。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条