1.
Vertical Itemized Back Pretreatment Medium-length Hole Throwing Blasting Spacing Cementation Filling Mining Method
竖分条预控顶中深孔抛掷爆破间隔胶结充填采矿法
2.
Study of Prediction and Control of Roof Accidents and Subsidebce Calamity in Fully Mechanized Top-Coal Caving Stope;
综放采场顶板事故及沉陷灾害预测与控制研究
3.
Insurance of the Thickness of Precast Concrete Core Slab at the Top
预制混凝土空心板顶板厚度的质量控制
4.
A Study on Intelligent Control for Ram Piston Pressure and Forecast for Mixing Characteristics of Mixer
密炼机上顶栓压力智能控制与混炼性能参数预测的研究
5.
Mechanism of settlement control of piled raft with gap or compressible block at pile top for support of railway embankment
桩顶预留净空或可压缩垫块的桩承式路堤沉降控制机理研究
6.
It is easy to prophesy after the event.
事后诸葛亮,预言顶便当。
7.
STUDY OF CONTROL CAVING METHODS AND REASONABLE HANGING ROOF LENGTH ON HARD ROOF
坚硬顶板控制放顶方式及合理悬顶长度的研究
8.
Thermostats are factory set and wired in accordance with the wiring diagram fastened to the inside of the top access panel.
温度控制装置在工厂就预先设置,并且按照电路图所示进行布线,固定在热水器顶部面板入口内。
9.
pneumatic filling roof control
风力充填法控制顶板
10.
Main roof first collapse law and measure of controlling roof in seam with approximate shallow depth
近浅埋煤层老顶初次垮落规律及控顶措施
11.
Design of Automatic Height Control System for Cotton's Top Cuter
棉花打顶机打顶高度自动控制系统的设计
12.
1.8600 - 1.8750GBP/USD RATE PEAK TRADING RANGE USD 1.8600 - 1.8750
英镑兑美元 息口见顶 预期波幅
13.
Gary: A lot of top people in America went to prep schools.
美国很多顶尖人物,都读过预备学校。
14.
The Sytdy to Stress Regularities of Distribution of RPC Prestressed T-girder Upper Plate;
RPC预应力T梁顶板应力分布规律研究
15.
Forecast of electricity consumption of 2000~2015 in Pingdingshan city;
平顶山市2000~2015年用电量预测
16.
Fuzzy Comprehensive Evaluation and Prediction of Coal Seam-roof Stability Based
煤层顶板稳定性模糊综合评判和预测
17.
The study on the time-domain prediction of ship motion in head waves based on Rankine source
顶浪中船舶运动的时域预报方法研究
18.
Prestress Loss Induced by Friction in Suspendome Construction
弦支穹顶结构预应力张拉的摩擦损失