说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 右边界限制条件
1)  right-frontier constraint
右边界限制条件
2)  Limit of boundary conditions
边界条件的极限
3)  limited right boundary
极限右边界
1.
Research on the equivalent stability criteria calculation for bulk grain carriers based on limited right boundary;
基于极限右边界的散装谷物船舶稳性等效衡准
4)  Boundary condition control
边界条件控制
5)  compulsive boundary condition
强制边界条件
1.
Under a compulsive boundary condition,a simplified time-domain finite-difference beam propagation method(TD-FD-BPM) suitable for the analysis of fiber Bragg grating(FBG) is presented.
 提出了一种便于分析光纤布拉格光栅(FBG)、基于强制边界条件的简化TD FD BPM模型。
6)  boundary condition
边界条件
1.
Defining the turbulent mixing coefficient and the corresponding flux-boundary conditions for the dust diffusion equation;
ESP粉尘二维输运方程中紊流掺混系数及边界条件的确定
2.
Boundary conditions of finite difference time domain simulation in room acoustics;
室内声学时域有限差分模拟中的边界条件
3.
Sensitivity analysis on boundary conditions in numerical simulation of seepage flow through dam foundation;
闸坝地基渗流计算中边界条件敏感性分析研究
补充资料:JIT准时制生产(及时制生产)

JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条