说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 超额分享制
1)  excess sharing system
超额分享制
1.
According to the principles of remuneration designing, the main form of an incentive remuneration should be leasing system and excess sharing system.
根据报酬设计的原则,确定激励性报酬的主要方式为租赁制和超额分享制
2)  excess control
超额控制
1.
Excess Control,Board Composition and Corporate Diversification Discounts;
超额控制、董事会构成与公司多元化折价
2.
Study on Actual Controller、Excess Control and Corporate Performance in the Listed Companies in China;
实际控制人、超额控制度与我国上市公司经营绩效研究
3.
The Excess Control、Cash Flow Rights of Ultimate Controlling Shareholder and Corporate Transparency
终极控制股东超额控制、现金流权与公司透明度——来自深市民营上市公司的证据
3)  Over Distribution of the Dividends
超额分红
4)  sharing mechanism
分享机制
1.
Considered of various needs for individual,enterprise and government in capital investment sharing,four investment sharing mechanism including investment oriented,benefit oriented,outer oriented and dua.
针对员工个人、资源型企业和资源型政府在人力投资收益中的不同价值取向,设计了投资导向型、利益导向型、外部导向型和双高平衡型的投资分享机制,并在资源型城市经济转型的技能培训政策中进行了应用。
5)  share system
分享制
1.
The share system on the basis of ESOPs and mutual governance is helpful to achieve economic benefits of human capital property rights, decrease the degree of incompleteness of labor contract, and enhance the self-enforcing capability.
基于职工持股共同治理模式下的分享制有助于实现人力资本产权的经济利益,降低契约不完全程度,提高其自我强制实施能力,改善劳动关系。
6)  share of residual control
控制分享
补充资料:JIT准时制生产(及时制生产)

JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条