说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 工程造价审计
1)  engineering cost audit
工程造价审计
1.
The application of the bill account system brings the engineering cost audit a new train of thought.
工程量清单计价办法的实施给工程造价审计工作带来新的思路,无论在审核原则还是审核方法上,现阶段的工程造价审计工作都发生了重大变化。
2)  examination and determination of the project cost
工程造价审定
3)  Construction Cost Audit
工程造价审核
4)  build price audit
造价审计
1.
In this paper, based on the audit actual build price, from the view of build price audit, it aims at currently the spot engineering modification list problem with classification analysis, and puts forward to make good engineering modification list audit method.
本文以实际造价决算审计结果为依据,从造价审计角度,针对目前现场工程签证存在的相关问题进行了分类分析,在此基础上,针对性地提出了搞好工程签证审计的方法。
5)  audit on engineering projects
工程审价
6)  engineering audit
工程审计
1.
Problems existed in construction engineering audit and countermeasures;
浅谈建设工程审计中常见的问题及对策
2.
The problems existed in contract engineering audit and its countermeasures;
出包工程审计中存在的问题及对策
补充资料:发电工程造价


发电工程造价
power project construction cost

fadion gongeheng zoojlo发电工程造价(power projeet constructioncost)指发电工程从前期工作开始,到投产发电的全部工程费用。它因内容不同可分为发电工程静态投资、发电工程动态投资。 发电工程静态投资由建筑工程费、设备购!费、安装工程费、其他费用、基本预备费和材料价差组成,其反映的是某一价格水平年的静态造价水平。1998年价格水平中国内发电工程单位造价水平为:2x300MW国产引进型机组新建4422元/kW,扩建3759元/kw,4台机组时4090元/kw;2X600MW国产引进型嫌煤机组新建3675元/kW,扩建3381元/kw,4台机组时3528元/kw;2 x 300 MW等级进口嫩煤机组新建5010元/kw,扩建4460元/kw,4台机组时4735元/kW;2x600MW等级进口燃煤机组新建4640元/kw,扩建4450元/kW,4台机组时4545元/kW。 发电工程动态投资由发电工程静态投资、价差预备费和建设期贷款利息组成,其中价差预备费是指工程从编制年至竣工年期间建筑工程费、设备购置费、安装工程费、其他费用上涨而预备的费用;建设期贷款利息是指工程项目的各类融资在建设期发生的利息。按电力工程单机竣工结算办法,第一台机组及公用系统所发生利息计算到第一台机组投产前一季度,第二台机组投资所发生的利息计算到第二台机组投产,以下类推。1”8年审批的发电工程初步设计概算动态投资情况如下:2台30万新建国产机组为4997元/kW,2台60万扩建国产机组为4481元/kW,2台35万新建进口机组为5588元/kW,2台“万新建进口机组为6388元/kW。由于价差预备费、建设期贷款利息与国民经济发展情况、物价上涨情况、利息变化情况有关,而这些因素往往具有不可预见性,因此从1995年起对工程概算执行“静态控制,动态管理”的政策,即控制静态投资在批准的额度以内,动态投资则可根据实际情况进行调整。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条