1) estimation and controlling of construction cost
工程造价计价与控制
2) method of price estimation and controlling
设计阶段工程造价计价与控制的方法
3) engineering cost control
工程造价控制
1.
On engineering cost control of dredging at Teyong segment in Xinyang Harbor;
新洋港特庸段拓浚工程造价控制探讨
2.
Hydropower station construction engineering possesses long-term construction and huge investment character,thus engineering cost control management becomes an important problem.
因此工程造价控制管理成为工程建设中重要的环节。
3.
The article,by briefly explanining the concept,characteristics and advantages of EPC porject control mode,and introducing its operation mode,engineering cost control under EPC modes as well as comparing the differences of cost control between traditional management mode and EPC mode,shows the function and importance of cost control in the process of the whole project.
简述了EPC项目管理模式的概念、特点、优势,介绍了EPC模式的运作方式,以及EPC模式下的工程造价控制;对在传统管理模式下和在EPC模式下造价控制的不同之处作了对比;从整个工程承包过程来阐述造价控制的作用和重要性。
4) control of construction cost
工程造价控制
1.
This article is going to analyze the problems existing in the control of construction cost in the design stage,and discuss the importance of the design stage to the control of construction cost with actual examples,and then put forward the measures to do well in the control of construction cost in the design stage.
分析设计阶段工程造价控制中存在的问题,并以实例论述设计阶段对工程造价控制的重要性,并提出如何搞好设计阶段工程造价控制的措施。
5) construction cost control
工程造价控制
1.
The construction cost control runs through the whole course of the engineering project construction.
建设项目工程造价控制是一个贯穿项目建设全过程的、复杂的系统工程,从项目立项和可行性研究阶段、设计阶段、实施阶段和竣工结算审核阶段入手,探讨如何有效地控制高等学校建设项目的工程造价,并提出了提高建设项目投资效益的措施。
2.
The developer should obtain from the design stage,from the source control engineering construction cost,this article has discussed the project construction cost control effective way from five a.
开发商应从设计阶段入手,从源头控制工程造价,从五个方面探讨了工程造价控制的有效途径。
3.
From the angle of economy, this paper analyses the main problems existing in construction cost control at present and, connecting with the experiences of international construction project management and actual situation of our country, puts forward some basic ideas of controlling construction cost under the new situation.
从市场经济的角度,分析了当前建设项目工程造价控制中存在的主要问题,结合国际工程项目管理做法和我国实际现状,提出了新形势下控制工程造价的基本思路。
6) control engineering cost
控制工程造价
1.
This paper discusses the management of engineering cost, analyzes the method to control engineering cost from different aspect, and states how to control engineering cost in reason.
本文对工程造价管理角度进行了论述,从不同的角度分析了控制工程造价的方法,阐明如 何科学地控制工程造价。
补充资料:发电工程造价
发电工程造价
power project construction cost
fadion gongeheng zoojlo发电工程造价(power projeet constructioncost)指发电工程从前期工作开始,到投产发电的全部工程费用。它因内容不同可分为发电工程静态投资、发电工程动态投资。 发电工程静态投资由建筑工程费、设备购!费、安装工程费、其他费用、基本预备费和材料价差组成,其反映的是某一价格水平年的静态造价水平。1998年价格水平中国内发电工程单位造价水平为:2x300MW国产引进型机组新建4422元/kW,扩建3759元/kw,4台机组时4090元/kw;2X600MW国产引进型嫌煤机组新建3675元/kW,扩建3381元/kw,4台机组时3528元/kw;2 x 300 MW等级进口嫩煤机组新建5010元/kw,扩建4460元/kw,4台机组时4735元/kW;2x600MW等级进口燃煤机组新建4640元/kw,扩建4450元/kW,4台机组时4545元/kW。 发电工程动态投资由发电工程静态投资、价差预备费和建设期贷款利息组成,其中价差预备费是指工程从编制年至竣工年期间建筑工程费、设备购置费、安装工程费、其他费用上涨而预备的费用;建设期贷款利息是指工程项目的各类融资在建设期发生的利息。按电力工程单机竣工结算办法,第一台机组及公用系统所发生利息计算到第一台机组投产前一季度,第二台机组投资所发生的利息计算到第二台机组投产,以下类推。1”8年审批的发电工程初步设计概算动态投资情况如下:2台30万新建国产机组为4997元/kW,2台60万扩建国产机组为4481元/kW,2台35万新建进口机组为5588元/kW,2台“万新建进口机组为6388元/kW。由于价差预备费、建设期贷款利息与国民经济发展情况、物价上涨情况、利息变化情况有关,而这些因素往往具有不可预见性,因此从1995年起对工程概算执行“静态控制,动态管理”的政策,即控制静态投资在批准的额度以内,动态投资则可根据实际情况进行调整。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条