2) co-processing
同时处理,同时加工
5) serial batching problems
串行工件同时加工排序
1.
This paper mainly deals with two scheduling problems with two machines,one is parallel identical machine scheduling problem,the other is parallel identical machine scheduling problem of serial batching problems with each batch contains exactly k jobs.
主要讨论了具有两台处理机的平行机排序问题和每批恰为k个工件的串行工件同时加工排序的平行机排序问题。
6) linear processing time
线性加工时间
1.
The two - machine flow shop scheduling problem is considered with linear processing time and chains con- straint in order to minimize the make - span.
讨论作业具有线性加工时间,作业间具有链约束的两台处理机流水作业排序问题,目标函数为极小化完工时间。
2.
The single machine scheduling problem is discussed with tree-structured and linear processing time.
讨论工件具有线性加工时间,工件间优先约束为树约束的单机排序问题。
3.
This paper considers the single machine scheduling problem with chain-structured and linear processing time.
讨论工件具有线性加工时间,工件间具有链约束的单机排序问题。