1.
The Parallel Batch Scheduling Problem with Family Jobs and Equal Processing Time to Minimize the Weighted Total Completion Time
加工时间相同的分族分批排序加权总完工时间问题
2.
E/T Scheduling Problem with Uniform Processing Time and Common Due Window for Single Machine
工件具有相同加工时间和相同窗口交货期的单机E/T调度问题
3.
SCHEDULING IN FLOW SHOP WITH IDENTICAL PROCESSING TIME ON EACH MACHINE;
各机器上具有相同加工时间Flow Shop调度问题
4.
Simultaneous Processing and Successive Processing of Analogical Vocabulary;
相似性词汇同时性加工与相继性加工的比较
5.
unsocial hours
与正常社交活动时间相冲突的加班工作时间
6.
The Relationship Between Temporal and Non-temporal Information in Cognitive Processing;
认知加工中时间与非时间信息的相互关系
7.
A RESEARCH ON THE CORRELATION OF TEMPORAL LOCUS, TEMPORAL DURATION ANDTEMPORAL SUCCESSION INFORMATION PROCESSING;
时点、时距和时序信息加工之间相关性研究
8.
To happen at the same time or during the same period.
同时发生发生在相同时间或相同时期
9.
Socialize with staff outside of the job setting.
在工作时间外,要与同僚互相交谊,参与社交活动。
10.
Minimizing makespan on a batching machine with batch arrivals
极小化最大完工时间的批到达同时加工排序问题
11.
Meanwhile, efforts will be stepped up to complete the preparatory work for the project to divert the water in the south to the north and begin the construction of the project as quickly as possible during the 10th Five-Year Plan period.
同时,加紧南水北调工程的前期工作,力争“十五”期间尽早开工建设。
12.
His time of arrival coincided with yours.
他到达的时间与你相同。
13.
An Unbounded Batch Scheduling Problem with Incompatbile Job Families to Minimize the Weighted Total Completion Time
一类无界的不相容工件族分批排序加权总完工时间问题
14.
the root-mean-square deviation of time after NMO is smaller, which is suitable to realize in-phase stack.
动校正后的时间均方差较小,有利于实现同相叠加。
15.
work overtime
(超出时间的工作)加班
16.
It's time to pack up, comrades.
同志们,收工的时间到了。
17.
Time:8 hrs. earlier than GMT; Same time with Beijing Time.
时差:比格林尼治时间早8小时;与北京时间相同。
18.
Time: same as GMT; 8 hours later than Beijing Time.
时差:与格林尼治时间相同;比北京时间晚8小时。