1) water pump-injection earthquake
抽注水地震
3) injection-induced seismicity
注水诱发地震
1.
From December 3, 2005 to May 18, 2006, a water injection-induced seismicity test was conducted on DuPont test well 1 for about six months by China Earthquake Administration.
2005年12月3日—2006年5月18日,中国地震局对山东东营杜邦1井(直井)进行了6个月的注水诱发地震监测。
4) seismic monitoring for waterflood
注水地震监测
1.
Effects of temperature and pressure on seismic monitoring for waterflooding.;
温度与压力对注水地震监测的影响
5) pumping grouting
抽水注浆
1.
Combined with the continuous concrete box beam construction in Haizigou bridge work as example the pumping grouting method of vertical prestressed duct of reinforcement are analyzed from four aspects: drilling, intubation, pumping and grouting; at the same time corresponding resolving measures are proposed.
结合海子沟大桥四跨连续混凝土箱型梁施工工程 ,就其竖向预应力钢筋孔道的抽水注浆方法 ,从打孔、插管、抽水、灌浆四方面进行了分析 ,提出了相应的处理方
6) Seismic pump inhaling
地震泵抽吸
补充资料:抽抽趔趔
1.犹言别别扭扭。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条