1) construction enterprises cost control elements
施工企业成本控制要素
5) On Controlling of Enterprise Cost
谈企业成本控制
6) construction cost control
施工成本控制
1.
In view of the plateau climate condition the internal and external factors influencing the construction cost control of railway in plateau region are analyzed and discussed comprehensively.
对在高原气候下铁路施工成本控制所受到的外部和内部环境的影响因素进行了综合的论述和分析 ,结合施工的实际经验 ,提出了在高原铁路施工管理中实施成本控制的方法。
2.
The most important problem of the construction enterprise is the construction cost control,and the construction cost control can be divided into advance control,course control and after control.
施工企业最突出的问题是施工成本控制,施工成本控制可分为事先控制、事中控制(过程控制)和事后控制。
3.
This paper expounds the connotations of strengthening the project management,and discusses the problem of how to strengthen the construction cost control from aspects of the labor cost,material cost and equipment cost.
阐述了强化项目管理的内涵,从人工费、材料费、机械费等方面论述了如何加强施工成本控制的问题。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条