说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 多孔抽水
1)  multi-hole pumping
多孔抽水
2)  many holes pump water experimentation
多孔抽水试验
1.
The many holes pump water experimentation in Zhongyishui Siphon invest igation is to make up the limits of Single hole pump water experimentation and provide reasonable hydrology geolo gy data for designing.
中易水倒虹吸进行的多孔抽水试验,弥补了单孔抽水试验的局限性,为设计单位提供了合理的水文地质资料,根据试验过程中出现的问题,对多孔抽水试验的可操作性及可行性进行了分析。
3)  pumping and drilling
抽水钻孔
4)  drill-hole pumping
钻孔抽水
1.
The results of practical study shows that the multidisciplinary analysis method can demonstrate the space-time relations between drill-hole pumping and land deformation in many aspects.
实践研究表明 ,采用综合分析方法可以从多方面论证钻孔抽水与地面变形的时空关系 ,为治理此类地质灾害、合理控制地下水开采量提供可靠的科学依据 。
5)  suction eye
抽水孔
6)  multiple outlet sluice
多孔水闸
1.
A CAD system for multiple outlet sluice is developed,whose structure includes many functional modular blocks such as structural analysis,seepage flow,graphic processing,budget,etc.
介绍了多孔水闸CAD系统的研究情况,着重讨论了系统构造、功能研制方法、参数绘图的处理、结构分析、结构优化和有限单元法在渗流和应力分析中的应用。
补充资料:凯夏多尔抽水蓄能电站

凯夏多尔抽水蓄能电站

Kaishador Pumpedstorage Plant,Кайсядорская ГАЭС


概  述

  凯夏多尔抽水蓄能电站是立陶宛共和国在建的一座电站。建在地形、地质和水文条件优越的考纳斯水库的右岸。总装机容量160万kW,年发电量24亿kW·h。主要是承担立陶宛西北联合电网的尖峰负荷。
  电站主要建筑物包括上、下蓄水库和电站厂房等。上库建在半挖和半填的高地上,挡水堤长6600m,库容0.465亿m3,有效库容0.375m3,库水位消落深度13.5m。下库是利用已建成的考纳斯水电站水库,库容5亿m3,库长80km。厂房设有330kV的室外配电装置和生产服务设施,为矩形布置,平面尺寸为57m×184m,高50m,由2个机组段组成,共布置8台可逆混流式机组,转轮直径6.3m。设计水头100m,水轮机工况机组容量20.5万kW,流量226m3/s;水泵工况时机组功率21.7万kW,最小扬程14.8m;机组重900t,其中包括转轮重97t。水轮机工况下可逆式电动机-发电机功率为20万kW,水泵工况下为22万kW。进水建筑物设有8孔进水孔和8条输水廊道,平面尺寸9.5m×10m,长165m。孔口设有拦污栅,装有事故检修闸门和平板检修闸门。水轮机工况进水孔流量1808m3/s,水泵工况1512m3/s。输水管直径7.5m,长658m,每节管长40m,管壁厚0.7m。
  主要工程量:土方开挖量0.16亿m3,填方和回填量0.16亿m3,混凝土和钢筋混凝土浇筑量80万m3,钢筋用量6.2万t,金属结构和机械安装量1.66万t。工程总工期(包括施工准备期)为6年,施工人数3500人。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
多孔配水管  多孔隙排水  多孔排水管  多孔水洗器  多孔布水器  7-12抽水试验钻孔 
  ©2011 dictall.com