说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 洪门
1)  Hongmen
洪门
1.
Hongmen Ductile Shear zone Strikes in the direction of Eastnorth.
洪门韧性剪切带呈北东向延展,是鹰潭—安远潭断裂北端的组成部分。
2)  floodgate [英]['flʌdɡeɪt]  [美]['flʌd'get]
泄洪闸门
1.
The situation of leak in floodgate of Lushi water project is introduced, cause and the urgency of it is analyzed.
介绍了陆水枢纽泄洪闸门漏水情况,分析了原因和危害性,总结了对其中5号闸门漏水的研究和处理,提出了继续处理的必要性和基本条件。
3)  flood discharge opening
行洪口门
1.
Demonstration on width for flood discharge opening of Hutuo River Inverted Siphon;
滹沱河倒虹吸行洪口门宽度的方案论证
4)  flood strobe
溢洪闸门
1.
The control and management system of flood strobe;
溢洪闸门自动控制及管理系统
5)  spillway gate
泄洪闸门
1.
After introducing the design, debugging, and operation of the spillway gate monitoring & control system at the Fuchunjiang Hydropower Plant, this paper indicates the functions of this system.
介绍了富春江水力发电厂泄洪闸门计算机监控系统的设计、调试和运行情况,指出了该系统发挥的功能和作用。
2.
The theoretical model and the calculation method for the control of the spillway gate in the reservoirs are studied, and a new model for the optimization procedure of the dynamical tracking of practical spillway flow is developed.
从理论模型和计算方法上对水库泄洪闸门控制问题作了深入的探讨 ,提出了实际下泄流量动态跟踪优化过程的新模型 ,并以一次洪水优化调度计算出的优化泄水曲线为依据 ,建立能量损失函数 ,求解闸门启闭方案 ,制定闸门控制策略 。
3.
This paper briefly introduces the present status of the spillway gate,the structure and features of the reformed computer monitoring & control system and the reformation of rolling bearing at the fixed roller gate in the Penglatan hydropower plant.
介绍了蓬辣滩水电站泄洪闸门的状况、计算机监控系统改造方案的结构和特点及闸门定轮轴承的改造情况,通过上述改造,提高了泄洪设备运行的自动化水平,同时也为其他闸门工程提供参考。
6)  HongMen Reservoir
洪门水库
1.
The Investigative Report on the Spiders in the Wetland around HongMen Reservoir in JiangXi Province;
江西洪门水库周边湿地蜘蛛资源的调查
补充资料:绍兴庚辰余游谢康乐石门与老洪道士痛饮赋诗
【诗文】:
爱酒黄冠鬓如雪,石门邂逅一樽同。
悬知久作此山土,愁对画图秋雨中。



【注释】:
【注释】:原题:绍兴庚辰余游谢康乐石门与老洪道士痛饮赋诗既还山阴王仲信为予作石门瀑布图今二十有四年开图感叹作



【出处】:
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条