说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 初始场结构
1)  initial field structure
初始场结构
2)  initial structure
初始结构
1.
The initial structure design of ellipse reflector and quadrilateral rod lens in illumination system;
照明系统中椭球反光碗及方棒的初始结构设计
2.
The effect of triethanolamine(TEA) on the initial structure formation and mechanical properties of cement was investigated by the testing of setting time,resistivity,chemical shrinkage,flexural and compressive strengths.
通过对凝结时间、电阻率、化学收缩、抗压强度测试,探讨了三乙醇胺(TEA)对硅酸盐水泥初始结构形成和力学性能的影响。
3.
Tabu Algorithm is adopted to optimize the initial structure of ellipse reflector in terms of the utilization of energy.
从能量利用率角度,采用Tabu算法对椭球反光碗的初始结构进行了优化,得出椭球反光碗长短轴之比与逃逸能量的变化关系,并对棒状透镜的尺寸的选取做了一定的分析。
3)  First structure of coating layer
初始层结构
4)  Initial structural
初始结构性
5)  structure initialization
结构初始化
6)  structural initial state
结构初始态
1.
It is suggested that the multiple load path method considers the influence of the structural initial state through simulating construction process under structure′s self-weight.
提出了在进行多重荷载路径法分析时应通过结构自重的施工模拟来考虑结构初始态的重大影响,以及运用结构动力学理论推导出结构在不同构件失效时间下的动力响应,建议在进行多重荷载动力分析时应考虑不同构件失效时间的影响。
补充资料:采场底部结构


采场底部结构
sill structure of stope

  eaiehangd一bu Jiegou采场底部结构(5111 strueture of stope)矿石自崩落处借助重力、爆力或运搬设备,沿采场已采空间下运的.采场底部出矿巷道的组合。底部结构是采场结构的重要组成部分.它在很大程度上决定着采场的生产能力及其他技术经济指标。设计和选择采场底部结构的基本要求是,在保证出矿巷道稳定作业安全及需要的出矿能力的条件下,尽量降低底柱高度和采准工作量,简化结构,且易于施工。 底部结构随出矿巷道的类型、数量、规格、组合关系及出矿方法、装备而异。采场用深孔(中深孔)落矿时,底部结构通常由四部分组成:(l)受矿漏斗或受矿槽。即最上层(受矿水平)出矿巷道,用以汇集采场矿石于其底部的放矿口放人下部水平。(2)装矿巷道或嗣室。位于运输水平,用来将矿石装人矿车及其他运输容器中。(3)二次破碎巷道或中间出矿巷道(电耙道、铲运机装运巷道等)。位于受矿水平和运输水平之间。前者用来将大块矿石破碎到允许块度;后者则将受矿巷道放出的矿石集运到通往运输水平的溜井,并在其中进行二次破碎.(4)受矿水平、二次破碎水平及运输水平间转运矿石的巷道(漏斗颈、斗穿、出矿口、溜井等)以及通往出矿作业的联络巷道。采场底部结构也可以根据需要简化和变型。如当用浅眼落矿并在回采工作面进行二次破碎时,不设二次破碎水平,矿石由受矿巷道经斗颈、漏口流人运输水平的矿车。 底部结构可按不同特征分类,如按有无二次破碎水平、受矿巷道型式(漏斗式、堑沟式、平底式)、运搬方法和设备(重力、电耙、自行装运设备、震动放矿装置等)等。将各类巷道综合成多种结构,以适应不同的开采条件的需要。采场底部结构的发展趋势是简化结构,提高矿石的流通性,降低堵塞频率,采用大型自行出矿设备或连续出矿装备。 (史维祥)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条