1) number of late jobs
延误工件个数
1.
This paper considers the onemachine scheduling problem to minmize the number of late jobs in group technology,where jobs are classified into groups and all jobs from the same group must be processed contiguously.
证明了成组加工的单机延误工件个数问题是强NP困难的,即使限定所有工件有单位加工时间且所有组间调整时间为零也是如此。
2.
This paper considers the one machine scheduling with batching to minimize the number of late jobs.
研究了以极小化延误工件个数为目标的单机分组排序问题,证明了该问题是强NP困难的,甚至限定所有工件有单位加工时间和一致的组间调整时间也是如此。
2) number of tardy jobs
延误工件数
1.
For the single machine scheduling problem with number of tardy jobs and controllable processing times, Daniels and Sarin gave some results for con- trucking the tradeoff curve between the number of tardy jobs and the total crashing times, but they had not developed such an algorithm.
对一台机器加工时间可控时的延误工件数问题,如何构造延误工件数和加工时间减少量之间的关系曲线,文献[1]给出了一些理论结果,但未给出具体算法,该文在恒为1的条件下,分析了文献[1]所获结果,证明了曲线上有效值的个数,并从考虑延误工件数出发在文献[1]基础上给出了构造上述曲线的具体算法。
3) Weighted Number of Early and Tardy Jobs
加权超前延误工件数
4) early/tardy job
超前延误工件
5) The number of tardy jobs
误时工件数
补充资料:最大处理器个数
最大处理器数量是指小型机的主板最多能支持多少个处理器(CPU)。
我们知道,对于一台普通PC(个人电脑)来讲,它得主板有多少个CPU插座,那么这台PC最大就能支持多少个CPU。但对于小型机来说就不完全是这种情况,现在的小型机主板一般都可以安插CPU扩展板,这样的小型机最大支持CPU数量就取决于扩展板和主板的双方面因素。总之,扩展性能越强,小型机的总拥有成本就越高。
我们知道,对于一台普通PC(个人电脑)来讲,它得主板有多少个CPU插座,那么这台PC最大就能支持多少个CPU。但对于小型机来说就不完全是这种情况,现在的小型机主板一般都可以安插CPU扩展板,这样的小型机最大支持CPU数量就取决于扩展板和主板的双方面因素。总之,扩展性能越强,小型机的总拥有成本就越高。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条