1) construction delay
工期延误
1.
In construction of a international water conservancy project , amount of works increases with variation of natural in-situ conditions , which leads to construction delay and construction cost increase , then economic losses of the Contractor.
在国际水利工程施工中,由于现场自然条件的改变(而非承包商的原因)引起工程量的增加,势必会导致工期延误和施工费用的增加,给承包商造成工期和经济损失。
2) construction period delay
工期延误
1.
Analysis on the construction period delay and its relative costs under the FIDIC contract conditions;
FIDIC 合同条件下工期延误及相关费用分析
3) project delay
工期延误
1.
Considering the difficulty of allotting responsibility of project delay in multi-event interference,a new analytic method based on Shapley value for the problem is presented in this paper.
在工程项目合同管理中,做好工期延误的责任归属和量化对于监理工程师公平、公正地处理工期索赔,维护业主和承包人的合法权益具有重要意义。
4) variance of construction time
工期延误率
1.
This paper examines the degree of time variance during the construction process by using the variance of construction time(△T).
工期延误是公共建设项目中常见的现象,以工期延误率△T来度量建设项目工期的变化,通过问卷调查和实地访谈,对影响建设项目工期的风险因素进行了调查,收集了深港两地515个公共建设项目的工期实际数据,利用逆高斯分布函数建立了评估工期延误风险的定量模型,并通过风险因素的相对重要性评分识别出了影响建设工期的前15位风险因素,这些风险因素分别来自业主、承包商、分包商、政府部门及其他5个方面。
5) the risks of delay
工期延误风险
6) postponement
[英][,pəust'pəunmənt] [美][post'ponmənt]
n.延误,延期