1) Xiaoliang Experimental Station
小良试验站
1.
community B: eucalyptus forest; community C: pine and eucalyptus mixed forest; community D: broadleaved mixed forest) in the Xiaoliang Experimental Station were compared with a local secondary tropical evergreen monsoon forest to study the feasibility of forest restoration in the tropical areas.
通过对小良试验站不同类型、不同林龄的3种人工林群落(群落B:桉林;群落C:松桉混交林;群落D:阔叶混交林)与当地自然次生热带季雨林(乡土林)相比较,从群落结构的角度探讨人工恢复热带森林的可行性。
3) Xiaoliang Water Resources Protection Station
小良水保站
4) Xiaoliang ecological station
小良生态站
5) Xiaoliang Soil and Water Conservation Station
小良观测站
6) Test station
试验站
1.
Analysis of setting-calculation method of incoming relay-protection in the low-pressure apparatus test station;
低压电器试验站进线保护整定方法的探讨
2.
The application of human machine interface(HMI) in low voltage electrical apparatus test station was introduced.
介绍了人机界面(HMI)在低压电器试验站中的应用。
补充资料:CESI网络试验站
世界著名的强电流断流试验站(见图)。全名为意大利中央电工研究所网络试验站。位于意大利北部米兰。1958年兴建。网络试验站通过变电所的输电线路将电流送至试验站的短路变压器,再经过限流电抗器和保护、合闸间开关进行试验。除了没有冲击发电机外,其他设施与断流容量试验站一样。CESI网络试验站引二回路220千伏线路至试验站,其试验用短路变压器为3台220/4×15kV、4×10kV;试验容量1964年已达8000MVA,到1980年后增大为30000MVA;最大电流为150kA。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条