说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 调整与移走时间
1)  removal and processing time
调整与移走时间
2)  removal time
移走时间
1.
Maximimal tardiness in two-machine no-wait flowshop with setup, processing and removal time separated;
有分离调整和移走时间的两机器no-wait流水作业最大延误问题
2.
The maximum tardiness in three-machine flowshop problem with separated setup,processing and removal time is discussed,where the setup time and removal time steps of the same job can overlap on three machines,but the processing time can not.
以最小化最大延误为目标函数,讨论了三台机器的流水作业问题,其中每个工件的操作由"调整"步、"加工"步以及"移走"步组成,而工件的调整和移走时间都与加工时间相分离,同一个工件的"调整"步和"移走"步在三台机器上可以重叠,但"加工"步不能重叠,并且第一台机器上没有空闲时间,工件一旦开始加工就不允许中断。
3.
In this paper,we discuss the total tardiness in two-machines flowshop problem with setup and removal time separated,where setup step and removal step of the same job is overlap on two machine,but the processing step can not be,and there is not idleness on the machine M_1.
讨论了一类两机器流水作业的总延误问题,其中每个工件的操作由“调整”步、“加工”步及“移走”步组成,而工件的调整时间和移走时间均独立于加工时间,同一工件的“调整”步及“移走”步在2台机器上可重叠进行,但“加工”步不能重叠,并且第一台机器上没有空闲时间,工件一旦开始加工就不允许中断。
3)  adjusting and processing time
调整与加工时间
4)  setup time
调整时间
1.
Lot-streaming in three-stage flow shop with setup times separated;
三台机器流水作业中存在不同调整时间的Lot-streaming问题
2.
For the lot-streaming problem in multi-stage flow-shop,the majority of the research in the past used to fix the number of the batches and find only the optimal batch sizes without consideration the setup time:In this paper,however,Setup time for the machines is introduced.
多台机器流水作业的 Lot-streaming问题(简称LS),以往的研究都不考虑调整时间,固定分批数,寻找最优分批大小;本文对机器引入调整时间,研究同时决定最优分批数及分批大小,并给出了相应最优算法。
3.
For the Lot-Streaming problem in a two machines flow shop, the majority of the research presented fixed the number of the sublets, or the two machines have the same setup times.
对二台机器流水作业中的Lot-Streaming问题(简称LS),以往的研究多为固定分批数寻找各批大小,或对二台机器引入相同的调整时间,寻找最优分批数及各批大小。
5)  setup times
调整时间
1.
This paper deals with the order planning of single machine with multi product classes and sequence independent setup times, and proposes a mixed integer programming model to minimize the sum of earliness/tardiness penalties of orders.
针对单机多产品多订单有序独立机器调整时间的订单排产问题 ,建立了以最小化订单的提前和拖期罚值总和为优化目标的混合整数规划模型 ,分析了问题的NP -hard性和最优排序中临近批组的优化特性 ,提出一个基于过滤束搜索的拟多项式时间算法 ,算法复杂性分析和仿真结果验证了算法的有效性 。
2.
In this paper,several parallel machine scheduling problems with setup times are discussed.
本文讨论带有工件调整时间的几种平行机排序问题,分析在不同情况下的计算复杂性。
3.
To efficiently solve multi-objective flow shop scheduling problem with setup times,a new multi-objective hybrid genetic algorithm(MOHGA) was proposed.
为高效地求解带调整时间的多目标流水车间调度问题,提出了一种多目标混合遗传算法,此算法依据基于Pareto优于关系的个体排序数和密度值计算适应度,保持解的多样性,并采用非劣解并行局部搜索策略,提高算法的搜索效率。
6)  set-up time
调整时间
1.
Three-machine no-wait flow shop scheduling problem with set-up time separated was studied.
研究了 3台机器调整时间可分离的无等待FlowShop调度问题 ,目标函数为极小化加权完工时间和·基于对问题的分析 ,给出了目标函数的一般表示·对某些特殊情况 ,给出了问题存在多项式最优算法的充分条件·在此条件下 ,将单机调度问题的WSPT规则应用到无等待FlowShop调度问题 ,得到了求解无等待FlowShop问题最优调度的分派规则·通过反例指出了文献中的某些错误
补充资料:从驩州廨宅移住山间水亭赠苏使君
【诗文】:
遇坎即乘流,西南到火洲。鬼门应苦夜,瘴浦不宜秋。
岁贷胸穿老,朝飞鼻饮头。死生离骨肉,荣辱间朋游。
弃置一身在,平生万事休。鹰鹯遭误逐,豺虎怯真投。
忆昨京华子,伤今边地囚。愿陪鹦鹉乐,希并鹧鸪留。
日月渝乡思,烟花换客愁。幸逢苏伯玉,回借水亭幽。
山柏张青盖,江蕉卷绿油。乘闲无火宅,因放有渔舟。
适越心当是,居夷迹可求。古来尧禅舜,何必罪驩兜。



【注释】:



【出处】:
全唐诗:卷97_29
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条