1) time modify algorithm
时间调整算法
1.
The operations starting and completion time are calculated in the time modify algorithm when the sequence and all processing times are known.
针对单件车间生产作业计划的再生问题,用VisualFoxpro开发了一个时间调整算法和实现了禁忌搜索算法。
2) time wrapping algorithm
时间规整算法
3) Logarithm of time fitting method
对数时间调整法
4) time slice scheduling algorithm
时间片调度算法
1.
To add a time slice scheduling algorithm in sharetime task,and creates new interfaces about task creating and destroying.
针对分时任务新增的时间片调度算法,给出调度算法的实现方法,并增加了任务创建和销毁的接口。
5) DM(Deadline Monotonic)
单调时间限算法
6) setup time
调整时间
1.
Lot-streaming in three-stage flow shop with setup times separated;
三台机器流水作业中存在不同调整时间的Lot-streaming问题
2.
For the lot-streaming problem in multi-stage flow-shop,the majority of the research in the past used to fix the number of the batches and find only the optimal batch sizes without consideration the setup time:In this paper,however,Setup time for the machines is introduced.
多台机器流水作业的 Lot-streaming问题(简称LS),以往的研究都不考虑调整时间,固定分批数,寻找最优分批大小;本文对机器引入调整时间,研究同时决定最优分批数及分批大小,并给出了相应最优算法。
3.
For the Lot-Streaming problem in a two machines flow shop, the majority of the research presented fixed the number of the sublets, or the two machines have the same setup times.
对二台机器流水作业中的Lot-Streaming问题(简称LS),以往的研究多为固定分批数寻找各批大小,或对二台机器引入相同的调整时间,寻找最优分批数及各批大小。
补充资料:调整保留时间
分子式:
分子量:
CAS号:
性质:见保留时间。
分子量:
CAS号:
性质:见保留时间。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条