说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 计划成本指标
1)  targets of planned costs
计划成本指标
2)  indication of fulfillment of plan
计划完成指标
3)  plan target
计划指标
4)  cost plan
成本计划
1.
Compilation and management on running cost plan for hydraulic construction enterprise;
水利施工企业成本计划的编制与管理
2.
Research on the Integration Model of Cost Plans and Cost Funds Dividing Plans in Large Scale Discrete Enterprises;
离散制造企业成本计划与成本金分解计划集成控制模式研究
3.
Analysis on the control of enterprises’ cost plan
浅析施工企业成本计划的控制
5)  cost planning
成本计划
1.
As an important part of cost management,cost planning is more and more important.
而成本计划,作为成本管理的重要组成部分,其重要性也就日益突显出来。
2.
The article illustrates the importance of cost control in overall process of engineering construction,introduces the inventory of budge engineering cost planning and its implementing elements,and discusses the method and requirement of cost control,in order to increase the profit of enterprise and to ensure its invincible position in the market.
阐述了成本控制在工程施工全过程中的重要性,介绍了预算工程成本计划的编制以及计划实施要点,论述了成本控制方法及要求,以提高企业利润,保证企业在市场中立于不败之地。
6)  plan cost
计划成本
1.
This paper probes into how to estimate the cost by using scientific methods and how to compile the plan cost according to the cost estimation,and how to control and manage the cost according to compiled plan cost.
探讨了如何用科学的方法进行成本预测,如何根据成本预测编制计划成本,并根据编制的计划成本进行工程项目的控制与管理。
2.
Although target cost,plan cost,estimated cost,fixed cost,standard cost are all cost control standards used in enterprises,yet some of them can be applied in a combination and others can not.
目标成本、计划成本、预算成本、定额成本、标准成本虽然都是企业进行成本控制的标准,但它们有的可以结合应用,有的却不能。
补充资料:成本考核指标(costexammingtarget)
  评价各成本中心业绩的主要依据。通过考核,可以促使各个责任中心控制和降低各项耗费,以便控制和降低各种产品的生产成本,成本考核指标主要集中于目标成本的完成情况,包括目标成本节约额是一个绝对数指标,它以绝对数来反映目标成本的完成情况,其计算公式如下:

  目标成本节约额=预算成本-实际成本

  目标成本节约率是一个相对数的指标,它以相对数的形式反映目标成本的完成情况。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条