2) multi-parameter processes with stable components
多指标稳定分量过程
1.
The Hausdorff measue problem for the rang and graph of multi-parameter processes with stable components are studied , and correct Hausdorff measure functions for these randon sets are given.
讨论多指标稳定分量过程像集与图集的适当Hausdorff测度函数,解决了这些随机集的Hausdorff测度问题。
3) process with stationary increments
稳定性增量过程
4) stabilization process analysis
稳定过程分析
5) Fractional stable processes
分数稳定过程
6) stable process
稳定过程
1.
In this paper we not only present an estimation of the average run length (ARL) for CUSUM (cumulative sum) control chart but also give a numerical comparison of CUSUM, GLR (Generalized Likelihood Ratio), GEWMA (Generalized EWMA) and RFCuscore (Reference-free Cus-core) control charts in detecting the mean shifts of stable processes.
本文给出了累积和控制图(CUSUM)监测稳定过程均值漂移的平均运行长度(ARL)的区间估计,并采用数字模拟的方法对CUSUM,GLR,GEWMA以及RFCuscore四种控制图监测稳定过程均值漂移的效果进行比较,结果显示CUSUM效果最好。
补充资料:长过程稳定计算
长过程稳定计算
long-term stability analysis
Chonggt」oehellg werld一ngj{s一旧rl长过程稳定计算(long一term、tability anal-ysis)电力系统受到严重扰动后较长过程的稳定性计算。计算中要计入在一般暂态穗定计葬中不考虑的电力系统长过程和慢速的动态特性,包括继电保护系统、自动控制系统、发电厂热力系统和水力系统以及核反应系统的动态响应等。长过程稳定计算的时间范围可从几十秒到几十分钟。 电力系统遭受扰动后的暂态过程一般在扰动后105左右结束。然而在严重故障或连锁反应故障的冲击下,系统发电和负荷之间的有功功率或无功功率可能出现长期持续偏移的不平衡状态而引起系统潮流、电压、频率等电气量和原动机系统变量的长期变化过程,并最终导致系统失去稳定。电力系统长过程不稳定一般不直接导致损失负荷.而是激发一系列引起系统解列(见并列与解列)形成孤岛、失去电源.并最终由于自动低频减负荷、自动低压减负荷或整个孤岛崩溃而损失负荷的事件。 电力系统复杂的长时间动态过程中混合着快速动态过程和慢速动态过程。系统受扰动后.有的元件响应速度很快.时间常数只有儿十毫秒,在数秒内即可达到相对稳定的控制状态,如直流控制系统、电力电子装置等.有的元件响应速度较慢,需要数十秒甚至几分钟才有反应,如火电厂的锅炉控制系统、自动发电控制系统等.因此,电力系统的长过程德定计算是典型的刚性动态系统的计算问题,要采用适用于刚性动态系统的数值积分算法,一般为具有自动变步长的隐式积分算法。目前通用的暂态稳定程序一般不设t详细的长过程动态元件模型,在暂态稳定过程中,系统的刚性不太明显,采用的数值积分算法一般不考虑系统的刚性间题,所以暂态德定程序通常不能适应长过程稳定计算的要求。 因此,具有能够处理电力系统快速动态过程和慢速动态过程的复杂模型和计算方法的长过程稳定计算程序是电力系统计算分析和仿真试验所需要的。 计算目的和应用范圈电力系统长过程稳定计算主要用来分析电力系统较长时间(几十秒到几十分钟)的动态过程.其主要应用范围为: (1)复杂和严重事故的事后分析,以了解事故发生的本质原因,研究正确的反事故措施。 (2)电压稳定性分析,研究电力系统电压稳定性的机理和防止电力系统电压崩清的有效措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条