您的位置:首页 -> 词典 -> 移模逐孔浇筑施工
1)  moving model shelf cost construction
移模逐孔浇筑施工
2)  moving trestle and span-by-span cast-in-place construction method
移动支架逐孔现浇施工法
3)  pouring [英][pɔ:]  [美][por]
浇筑施工
4)  span-by-span construction
逐孔施工
1.
The system, in the span-by-span construction of bridge, will experience three kinds of shifts from the state of simple beam to the continuous state,from overhanging beam to the continuous beam and from few-spans continuous beam to required degree span by span.
在桥梁工程逐孔施工过程中 ,体系将发生由简支梁状态到连续梁状态 ,由悬臂梁到连续梁 ,由少跨连续梁逐孔延伸到所要求的体系三种转换 ,同时结构计算图式和内力也发生变化。
5)  casted in segment
逐段浇筑
1.
According to the scheme of fixed moulding board casted in segment gradually,the tower stress of self-weigh.
为更好地进行施工控制本文详细计算了施工过程中塔柱及横梁截面应力及位移的变化,根据固定模板逐段浇筑的施式方案进行了施工过程的模拟,得出施工各工况中塔柱自重应力及位移,并根据分析结果提出施工中应注意的问题。
6)  case-in-place cantilever method
悬臂浇筑法施工
补充资料:滑模施工


滑模施工
slipform

米,暂时移开操作平台铺板,设里楼板底模及支撑,绑扎钢筋,浇灌楼板混凝土。这种方法施工时,一般要准备3~4套模板和支撑以便周转使用。但应注意,墙体模板滑空后,外侧模板与墙体接触部分的高度不应小于200mm.支设楼板模板时,不应损坏下层楼板的混凝土。拆除楼板模板支柱的时间应能保证楼板的结构强度满足承受上部施工荷载的要求。逐层滑空安装预制混凝土楼板,多用于不配筋或少配筋的墙体。安装时,先滑空承重墙的墙体,暂时移开操作平台铺板,然后再安装预制混凝土楼板。支承楼板的墙体混凝土强度不得低子2.SMPa,且不得用撬棍在墙体上娜动楼板,楼板的支承长度不宜小于70mm. (2)采用堵体上预留孔洞或现浇牛腿以支承预制混凝土楼板。这种做法要求现浇区的钢筋与预制楼板中的钢筋连成整体,安装预制板的支撑应待牛腿混凝土强度达到设计强度的70%以上方可拆除。 (3)采用降棋法施工现浇混凝土楼板.可利用滑模操作平台作为楼板的模板或支承。要周密设计吊具升降系统、操作平台与提升架之间的脱离措施,满足模板在自重和施工荷载作用下的强度和刚度要求。楼板与墙的连接,可采用在墙体预留孔洞、设里暗牛腿暗梁或在墙体上预留接搓钢筋(胡子筋)等方法处理,待楼板混凝土强度大于15MPa后,即可下降模板,进行下一层楼板的施工。 质t控制滑模操作平台和模板结构空间自由度很大,施工中要防止操作平台的偏移和扭转,保证建筑物的垂直度偏差在高度的0.1%以内,且不大于50tnm.施工中必须做到勤观测、勤调整,常用的观测设备有线锤、经纬仪、光学测锤、激光准直仪、激光平面仪、联通管高差指示器、自整角机同步指示器、限位卡调平装置等。操作平台偏移和扭转的原因有:滑模装里组装质童不合要求(如提升架倾斜,局部模板有反倾斜度)、各千斤顶的负荷差异过大或部分千斤顶运转不良、平台上随升起重设备运转的影响、支承杆不直或有部分杆件向一个方向倾斜、混凝土浇灌顺序不合理、模板收分不均匀、受风荷或日照温差影响而引起的建筑物变形等.施工中保持操作平台的水平提升可减少操作台的偏移,是保证垂直度的重要措施之一,一般可采用手动开闭千斤顶针阀、液压限卡阎、联通管自动调平系统、激光平面自动调平系统等来控制。当平台发生了偏移或扭转后,应先分析原因,消除产生的因素,然后再进行纠偏或纠扭.纠偏的方法有:改变模板的倾斜角度,调整千斤顶的倾斜方向,改变混凝土浇灌顺序,调整平台上荷载位!或局部增加重物,用钢绳牵引平台等。