1) controls in bracket construct
悬臂浇筑施工控制
3) cast-in-place cantilever method
悬臂浇筑施工
1.
The paper takes a bridge as an object of the study and focuses on the research of two points including structure analysis and high-pier buckling analysis of prestressed concrete continuous rigid frame bridge in construction with the cast-in-place cantilever method.
本文以某三跨连续箱梁悬臂施工阶段的过程模拟,针对连续刚构桥悬臂浇筑施工中的结构分析方法、高墩稳定性两个方面的问题进行了深入研究。
4) segmental cantilever casting construction
节段悬臂浇筑施工
5) cantilever construction
现浇悬臂施工
1.
Jiuweigang bridge was constructed with cantilever construction,this construction has higher technical requirements,so the bridge was supervised and controlled in the whole construction.
九圩港大桥采用挂篮现浇悬臂施工,施工技术要求高,为使得该桥顺利合拢,符合设计要求,对该桥进行了施工控制。
2.
The continuous prestressed beam was constructed with cantilever construction,this construction was high of technology,so the bridge was supervised and controlled in the whole construction.
预应力混凝土连续梁桥采用挂篮现浇悬臂施工,施工技术要求高,为使得该桥顺利合拢,符合设计要求,对该桥进行施工控制。
补充资料:工程施工控制测量
工程施工控制测量
【工租施工控侧侧.】为工程的定线放样而建立各种控制网的测量工作。为便于对主体工程的控制和施工放样,施工平面控制网多以主体建筑物的主轴线为依据扩展网形。建筑工程施工控制网多是布设成为与主要建筑物相互平行的方格网。在点位布设方面,重要建筑物的主轴线上,均应布有控制点。在精度方面,应能保证各种工程放样的不同要求。施工控制测量方法视工程的性质而定,对于建筑方格网而言,是先根据测图控制网点,放样出它的主轴线,然后从主轴线初步放样出全网的各点,再精密测出各点的实际坐标,然后,以各点的设计坐标为准进行点位改正并埋设牢固的点位标志。施工控制网多用假定的施工坐标系统。它是整个施工期间定线放样,峻工验收的依据。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条