1) the excavation of the gravity dam
重力坝开挖
2) abutment excavation
坝肩开挖
1.
This paper investigates the favourable impact of the central dumping during high arch dam abutment excavation on river closure.
分析了高拱坝坝肩开挖施工过程中产生的集中堆渣对河道截流的有利影响,提出了坝肩附近集中堆渣能降低截流戗堤龙口水力参数需具备的水力控制条件。
3) foundation excavation
坝基开挖
1.
Pre-splitting blasting technology for foundation excavation of high RCC double-curvature thin arch dam;
高碾压混凝土双曲薄拱坝坝基开挖预裂爆破技术
2.
Xiaowan arch dam foundation excavation and reinforcement analysis with 3D elasto-viscoplastic FEM;
小湾拱坝坝基开挖及加固的三维弹粘塑性有限元分析
4) excavation of dam foundation
坝基开挖
1.
The excavation of dam foundation would result in dam foundation rebound and then unloaded failure so that it makes the quality of foundation rock mass poor.
成果表明,采用光滑反弧形开挖,河谷应力集中区随坝基开挖向建基面下部转移,坝基开挖过程中未出现明显岩爆、剥离等高地应力现象;反弧形开挖较传统的平底开挖,坝基两侧应力集中现象、应力屈服范围等情况得到改善,坝基卸荷破坏有所减弱。
5) dam foundation excavation
坝基开挖
1.
Engineering geologic problem of dam foundation excavation in Guanyinge reservoir;
观音阁水库坝基开挖中的主要工程地质问题
6) the dam base excavation outline
坝基开挖线
1.
The optimization design results of the dam base excavation outline and the type and body shape of the arch dam of the Xiakou Hydraulic Project are introduced.
介绍了峡口水利水电枢纽工程技施设计阶段坝基开挖线、拱坝坝型和拱坝体型优化设计成果。
补充资料:非溢流重力坝
非溢流重力坝
non-overflow gravity dam
feiyiliu zhongliba非溢流重力坝(non一overflow gravitydam)坝顶不溢流的重力坝。各种型式的重力坝都可以建为非溢流坝。筑坝材料多用混凝土,中小型工程也可用浆砌块石。 在大多数重力坝枢纽中,于河床中部或主流部分布置溢流重力坝,两侧布置非溢流重力坝与岸坡相接,其间用边墩和导墙隔开(见重力坝图2)。少数工程,如中国刘家峡水电站,由于河谷狭窄,需布置电站厂房,岸边又有适宜条件布置溢洪道,经方案比较,设置了河岸式溢洪道,拦河坝全部为非溢流重力坝。非溢流重力坝可根据调洪预泄、放空水库、排沙等运用要求在坝身布置深式泄水孔。当有坝后厂房时,可穿过坝体布置发电引水管。 非溢流重力坝的坝体设有横缝、纵缝、止水、排水、廊道等(见坝体分缝、止水、坝内排水管、坝内廊道)。进行非溢流重力坝剖面设计时,常先拟定基本剖面,再根据运用和施工要求修改成为实用剖面(见重力坝剖面),然后进行详细的稳定和强度计算(见重力坝应力分析和重力坝抗滑稳定),根据计算结果再进行修正。为减小计算工作量,各国已编制了不少重力坝剖面优化程序,可用电算求解。剖面确定后,再进行分缝、止水、排水、廊道、坝内引水管、深式泄水孔等的设计和计算。对坝基稳定和处理应给予足够重视(见大坝岩基处理)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条