1.
Optimization and organization on excavation and construction of the left abutment of Hongjiadu Hydropower Station
洪家渡水电站左坝肩开挖施工优化与组织
2.
Blasting Vibration Measurement for Dam Abutment of Lijiaxia Hydropower Station
李家峡水站工程坝肩开挖的爆破震动测量
3.
The Geological Evaluation of the Rock Mass Engineering after the Excavation of the Spandrel Trough between the Banks of Xi Luo Du Hydropower Station;
溪洛渡水电站高拱坝两岸拱肩槽开挖后岩体工程地质评价
4.
Analysis of Initial Stress Field Regression and Excavating Abutment High Slope Using Three-dimensional Nonlinear Finite Element Method on Jinping;
锦屏水电站地应力场回归分析与坝肩槽开挖高边坡稳定性三维非线性有限元分析
5.
Analysis of Unloading Characters Due to Excavating Abutment High Slope Using Three-dimensional Nonlinear Finite Element Method and Study on Reinforcement Measurements in Xiaowan;
小湾坝肩槽开挖高边坡卸荷特性三维非线性有限元分析及加固措施研究
6.
Study on Excavation Disturbed Zone and Ogee Excavation Scheme of High-stress Dam Foundation at Deep Valley
高地应力峡谷高拱坝坝基开挖扰动效应与反弧开挖形式优化研究
7.
RESEARCH ON UNLOADING AND ZONATION OF ROCK MASS DAM FOUNDATION EXCAVATION-A CASE STUDY OF XIAOWAN HYDROPOWER STATION
坝基岩体开挖卸荷与分带研究——以小湾水电站坝基岩体开挖为例
8.
Quality Control of Foundation Excavating Construction of Arch Dam in Huanghuazai Hydropower Station
黄花寨水电站拱坝坝基开挖施工质量控制
9.
Finite element analysis of foundation unloading and relaxation effects of Xiaowan Arch Dam
小湾拱坝坝基开挖卸荷松弛效应的有限元分析
10.
3-D Nonlinear Finite Element Analysis and Program Developing on Concrete Arch Dam Abutment Stability;
混凝土拱坝三维非线性有限元坝肩稳定分析及程序开发
11.
Researches in the Influence of Foundation Excavation on Engineering Properties of Foundation Rock in High Arch Dam;
高拱坝坝基开挖对建基岩体工程特性影响的研究
12.
The Research on Security Monitoring Technology of Wu-du Reservoir Dam Foundation Blasting Excavation;
武都水库工程坝基开挖爆破安全监测技术研究
13.
Numerical Simulation of the Impact on Hongshi Dam Due to Blasting Excavation of Stilling Pool;
消力池爆破开挖对红石大坝影响的数值模拟
14.
Studies on Excavation Test of Rock Blasting and Vibration Monitoring in the Danjiangkou Dam
丹江口大坝爆破开挖试验及震动监测成果分析
15.
Cavern Excavation Method for Underground Powerhouse Complex at Xiangjiaba Hydropower Station
向家坝电站地下厂房系统洞室开挖方法
16.
Test Analysis on Blasting Vibration in Dam Foundation Excavation of Wanjiakouzi Hydropower Station
万家口子水电站坝基开挖爆破振动试验分析
17.
Process Control and Countermeasures to Cavern Excavation in Right Bank of Jinping Hydropower Station Dam
锦屏电站大坝右岸洞室开挖过程控制及对策
18.
Vibration Measurement and Analysis on Control Blasting Technology for Shaft Excavation of the Reservoir Dam Area
水库坝区竖井开挖爆破技术及振动测试分析