说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 监控与验收
1)  supervisory control and acceptan
监控与验收
1.
At present,military software products haven’t form the complete qual ity supervisory control and acceptance system as military hardware products.
针对这一现状提出了对火控软件在设计阶段 、编程阶段和产品阶段质量监控与验收的见解,供有关人员参考。
2)  construction and acceptance supervision
施工与验收监理
3)  supervisory control and data acquisiton
数据收集与监控
4)  acceptance monitoring
验收监测
1.
Application of photobacterium phosphoreum toxicity test on the environmental protection acceptance monitoring at project completion;
发光菌毒性试验在项目竣工环保验收监测中的应用
2.
The noise acceptance monitoring plays an important role in the environmental protection acceptance for construction project.
建设项目噪声验收监测,是建设项目竣工环境保护验收的重要组成部分。
3.
From a managerial point of view,the basic condition of acceptance monitoring is put forward in the end.
阐述了宾馆行业在环保设施竣工验收监测中应采取的关键步骤、运营过程中污染物的来源,提出了合理的监测因子和监测时段;同时从管理的角度,提出了验收监测应具备的基础条件。
5)  Construction monitoring works and research control
工程监测与试验控制
6)  charging monitor
收费监控
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条