说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 多资源约束进度编排问题
1)  multiple resource constrained project scheduling
多资源约束进度编排问题
2)  Resource constrained scheduling problem
资源约束排序问题
3)  multi-mode resource constrained project scheduling problem
多模式资源约束项目调度问题
4)  resource constrained project scheduling problem
资源约束项目调度问题
1.
After reviewing the development history and researching actuality of RCPSP, this paper brings forward a new heuristic ? a MIN-Q based heuristic for multi-resource constrained project scheduling problem combining with CPM and seriation optimization theo.
资源约束项目调度问题是项目进度管理中的典型问题。
5)  Multiple Resource Constrained
多资源约束
1.
An Advanced Resource Scheduling Method for Multiple Resource Constrained;
多资源约束的改进RSM方法
2.
For Multiple Resource Constrained Job-shop Scheduling Problem(MRCJSP),this paper presents a scheduling approach based on hybrid self-adaptive genetic algorithm(HSGA) which combining the method of heuristic and self-adaptive GA and establishes multiple resource constrained programming model.
针对多资源约束的车间调度问题,将启发式算法和自适应GA优化方法结合起来,提出了混合自适应GA方法,建立了多资源约束的车间优化调度模型。
6)  Multi-constraint Knapsack problem
多约束背包问题
补充资料:森林资源(见世界森林资源、中国森林资源)


森林资源(见世界森林资源、中国森林资源)
forest resources

sen Iin ziyuon森林资源(forest resources)见世界森林资源、中国森林资源。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条