1) multi-resource-constrained project
多资源约束项目
1.
Optimization scheduling research of multi-resource-constrained project based on mixed-intelligence algorithm;
基于混合智能算法的多资源约束项目优化调度
2) resource-constrained projects
资源约束项目
1.
Although the existing critical activity concept and its identification method are valid for projects without resource constraints,they are not very valid for resource-constrained projects,especially in situations involving more than one unit of renewable resource.
现有关键工作概念及其识别方法虽然适用无资源约束项目,但并不完全适用资源约束项目,尤其不适用可重复使用资源量超过一个单位的项目。
3) multi-mode resource constrained project scheduling problem
多模式资源约束项目调度问题
5) Stochastic resource constrained project scheduling
随机资源约束项目调度
6) resource constrained project scheduling problem
资源约束项目调度问题
1.
After reviewing the development history and researching actuality of RCPSP, this paper brings forward a new heuristic ? a MIN-Q based heuristic for multi-resource constrained project scheduling problem combining with CPM and seriation optimization theo.
资源约束项目调度问题是项目进度管理中的典型问题。
补充资料:森林资源(见世界森林资源、中国森林资源)
森林资源(见世界森林资源、中国森林资源)
forest resources
sen Iin ziyuon森林资源(forest resources)见世界森林资源、中国森林资源。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条