1) measurement construct
测量构造
1.
Methods Using earned value analysis, taking scope, time and cost into account together to build the measurement construct.
方法采用挣值分析(EVA),综合考虑范围、时间、成本3项约束,构建项目级测量构造。
2) tectonic geodetic survey
构造大地测量
1.
On the profile perpendicular to the fault zone and fractured band in Xianshuihe and also in the fault basin, utilized GPS points array of short range lines, markstone array of short baselines and precise laser ranging, we made the tectonic geodetic survey to obtain the best deformation distribution on the flaccid zone and creep zone of the fault.
利用短边GPS点阵、短基线标石阵和精密激光测距 ,在与鲜水河断裂带的断层破裂带垂直的剖面上和构造盆地内进行构造大地测量 ,获得了断层软弱带和断层蠕变带上的最佳形变分布。
3) constructing measured elements
测量要素构造
4) structural geological surveying of photo
像片构造地质测量
5) structural exploration
构造探测
1.
Application of 3-dimensions earthquake exploration technology to structural exploration in Yangcun Coal Mine;
三维地震勘探技术在杨村煤矿构造探测中的应用
6) structure forecast
构造预测
补充资料:测量与测量结果
测量与测量结果
测量与测量结果测量是以确定某个量的值为目的的一整套运作。例如,用米尺量布以确定布的长度为多少米,用体温汁量体温以确定体温为多少摄氏度等。测量的根本意义在于,可以将不能直接计数的量,如物体的长度、体积(容量)、质量(重量)等,通过测量确定其为多少米、多少升、多少千克等,从而变得可以汁数。依测量对象的性质和预定测量要求的不同,测量可能是简单的,也可能是复杂的。简单的量布和复杂的珠穆朗玛峰海拔高度的测量,都是对长度这个量的测量。 测量结果指由测量所得到的被测之量的量值,而量值则由牧字乘以计量单位组成。不管测量进行得多么仔细,测量结果都只是被测之量的真实量值的一个近似值。因此,在完整表述测量结果时,应包括给出测量不确定度。此外,必要时还要给出一些附加说明,如是单次测量所得还是多次测量所得,系统误差是否已作修正,以及测量时影响量的取值范围等
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条