1) Dynamic critical path
动态关键路径
1.
In view of allied critical path method of complex product scheduling algorithm have been proposed, without considering the problem of the critical path length of the product take change with scheduling impacts the effect of the scheduling, a scheduling algorithm based on dynamic critical path is presented.
针对已有的关于复杂产品拟关键路径调度算法,没有考虑产品关键路径长度随调度变化影响调度效果的问题,本文提出了一种基于动态关键路径的调度算法。
2) critical path/activity
关键路径/活动
3) critical path
关键路径
1.
The earned value analysis in project schedule based on critical path;
基于关键路径的项目进度挣值分析
2.
Workflow critical path algorithm based on activities;
基于活动的工作流关键路径算法
3.
The activities sequence in critical path of highway project network;
道路工程项目网络关键路径中的活动排序问题
4) key path
关键路径
1.
Study of time parameter and key path arithmetic in engineering building project network planning;
工程网络计划的时间参数与关键路径算法研究
2.
Affecting factors analysis of major equipment erection key path in PWR NPP;
压水堆核电站主设备安装关键路径影响因素分析
3.
Based on the utility analysis in the economics,by searching the key path between a traffic mode and another transfer mode in the intermodal transfer points,a utility cost model is put forward to evaluate and optimize the facilities layout alternatives of the urban intermodal passenger transfer points.
利用经济学中效用分析法,通过寻找枢纽内存在换乘的任何2种交通方式之间的关键路径,建立枢纽内设施不同布局方案的效用损失模型,以此评价和优化枢纽内设施布局方案。
5) critical paths
关键路径
1.
Solution of critical paths based on modified pulse coupled neural networks;
基于改进型脉冲耦合神经网络的关键路径求解
2.
Research of Three Algorithms for Finding the Critical Paths;
三种求关键路径算法的比较
3.
A new algorithm for finding the critical paths is proposed by using coding graph and without topological sort.
通过定义节点编码图概念,提出一种不需要拓扑排序的求解关键路径的新算法。
6) dynamic related path
动态关联路径
1.
In order to solve this problem, a new analytic model for power system fault diagnosis is developed that makes full use of the temporal information of alarm messages and employs the concept of the dynamic related path.
文中通过提出动态关联路径的概念,构造了能够充分利用警报信息时序特性的电力系统故障诊断的一种新解析模型,能够合理地描述现代电力系统多种保护配置下保护和断路器的动作时序关系,对于复杂故障可以得到更为明确的诊断结果。
补充资料:关键路径法
分子式:
CAS号:
性质:又称关键线路法。一种计划管理方法。它用网络图表示各项工作之间的相互关系,找出控制工期的关键路线,在一定工期、成本、资源条件下获得最佳的计划安排,以达到缩短工期、提高工效、降低成本的目的。CPM中工序时间是确定的,这种方法多用于建筑施工和大修工程的计划安排。
CAS号:
性质:又称关键线路法。一种计划管理方法。它用网络图表示各项工作之间的相互关系,找出控制工期的关键路线,在一定工期、成本、资源条件下获得最佳的计划安排,以达到缩短工期、提高工效、降低成本的目的。CPM中工序时间是确定的,这种方法多用于建筑施工和大修工程的计划安排。