1) walk-off time
走离时间
1.
The influence of walk-off time,initial time delay and initial peak power of clock pulses on the shape of output signal were numerically analyzed.
为了研究非线性光学环形镜解复用输出特性,采用双曲正割形控制脉冲和信号脉冲,对基于非线性光学环形镜全光解复用系统中信号的转换进行了理论分析,得到了脉冲峰值开关效率为100%时,所需最小初始时钟脉冲峰值功率应满足的条件,数值模拟了走离时间、初始时间延迟和初始时钟脉冲峰值功率对转换信号波形特性的影响。
2) Temporal walk-off
时间走离
3) FTRW
快时间距离走动
4) Spatial walk-off
空间走离
5) The time of cutting feed
走刀时间
6) removal time
移走时间
1.
Maximimal tardiness in two-machine no-wait flowshop with setup, processing and removal time separated;
有分离调整和移走时间的两机器no-wait流水作业最大延误问题
2.
The maximum tardiness in three-machine flowshop problem with separated setup,processing and removal time is discussed,where the setup time and removal time steps of the same job can overlap on three machines,but the processing time can not.
以最小化最大延误为目标函数,讨论了三台机器的流水作业问题,其中每个工件的操作由"调整"步、"加工"步以及"移走"步组成,而工件的调整和移走时间都与加工时间相分离,同一个工件的"调整"步和"移走"步在三台机器上可以重叠,但"加工"步不能重叠,并且第一台机器上没有空闲时间,工件一旦开始加工就不允许中断。
3.
In this paper,we discuss the total tardiness in two-machines flowshop problem with setup and removal time separated,where setup step and removal step of the same job is overlap on two machine,but the processing step can not be,and there is not idleness on the machine M_1.
讨论了一类两机器流水作业的总延误问题,其中每个工件的操作由“调整”步、“加工”步及“移走”步组成,而工件的调整时间和移走时间均独立于加工时间,同一工件的“调整”步及“移走”步在2台机器上可重叠进行,但“加工”步不能重叠,并且第一台机器上没有空闲时间,工件一旦开始加工就不允许中断。
补充资料:离走
1.犹言背道而驰。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条