说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 平面梯级
1)  plain scaling
平面梯级
1.
The following results are obtained:(1)a derivative formal context of an information system can be induced by the notion of nominal scale and the technique of plain scaling in formal concept analysis;(2)some core notions in rough set theory such as partition,upper and lower approximations,independence,dependence and reduct can be reinterpreted in derivative formal contexts.
利用形式概念分析中名义梯级背景(nominal scale)的概念,对信息系统进行平面梯级(plain scaling)得到了衍生的形式背景。
2)  scarped plain
梯级平原
3)  tread [英][tred]  [美][trɛd]
楼梯踏板;级面
4)  uniplanar gradient coil
单平面梯度线圈
1.
Aiming at the feature of fully open magnetic resonance imaging system,a new approach to the design of uniplanar gradient coils was proposed.
针对全开放磁共振成像系统的特点,提出了一种单平面梯度线圈的新型设计方法。
5)  Planar gradiometer
平面式梯度计
6)  bi-planar gradient coil
双平面梯度线圈
补充资料:长江流域梯级开发


长江流域梯级开发
cascade development on Changjiang River Valley

  水布娅 ﹄勺 n J任500400 300 200100︵已小粗哪袭咪)即帷芭王沱招徕河距清江河口里程(km)~山~~~~一一~~一~-一-~300思龟200 施山 河 图2清江梯级开发方案纵剖面示意 兴建高坝的条件;河道含沙量不大,水库可长期使用, 规划可装机289lMW,多年平均年发电量为84.9亿 kw·h。 清江干流河段分三级开发,即水布娅(1 49lMW)、 隔河岩(1 200MW)、高坝洲(20oMW)(图2)。其中, 隔河岩水电站于1 986年开工,1994年建成。最大坝高 151m,电站装4台单机容量300MW机组。高坝洲水 电站位于隔河岩水电站下游,最大坝 高57m,其水库是隔河岩下游的反调 节水库。水布娅水电站最大坝高 228m,装7台单机容量213MW机 组,是清江干流的骨干电站。 金沙江梯级开发金沙江是长 江上游的重要支流之一。自云南省 石鼓至四川省宜宾的河段长约1300 km,集中落差1685m。宜宾以上流域 面积47.3km“,多年平均流量4610 m3/s,多年平均径流量1456亿m“。 宜宾以上干流可开发水能资源5891。 Mw,多年平均年发电量3233亿kw·h。这口河段由 于水量充沛、落差集中、淹没损失小,动量指标优越, 但区域地质情况复杂,地震烈度大,交通不便,地下工 程量大,所以开发难度大。 按规划,石鼓至宜宾河段拟分8级开发,即虎跳峡有(600oMW)、洪门口(400oMW)、皮厂(5500MW)、站比较集中的一条河流。三座最大的水库分别为两河口(84亿m3)、锦屏一级(100亿m3)和二滩(58亿m“)。前两座是梯级中最大的调节水库。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条