1) Sample working
示范施工
2) NEC
施工合同示范文本
1.
This paper identifies typical construction risks by combining WBS,RBS and OBS together,and compares the terms on risk sharing anong the Internal Construction Contract and FIDEC and NEC.
通过比较《国内施工合同示范文本》、《FIDIC施工合同条件》、《NEC工程施工合同》在风险分担上的相关条款,总结了三者在风险分担上的不同。
4) construction code
施工规范
1.
Stipulations in relevant construction codes for buildings, and highways, bridges and culverts on the material and performance index of slurry are discussed and analyzed.
讨论分析了建筑和公路桥涵施工规范对泥浆材料和性能指标的规定,指出了泥浆材料和性能指标是与钻孔桩的施工工艺、桩的规格、土层条件以及设计桩侧摩阻力的要求密切相关。
2.
The code takes shield construction codes in Japan and Europe as references.
结合盾构技术及盾构施工规范在我国的发展状况,介绍了《盾构法隧道施工与验收规范》编制背景及编制过程。
5) standard construction
规范施工
1.
During construction of the earthnail retaining wall a poor drainage was caused by continuous rainfall,rain water entered back the earthnail retaining wall through the underground drains near the foundation pit\'s southern slope,together with non-standard construction methods,hence large areas of collapse have occurred in quite a few earthnail retaining wall and slope under construction.
并对黄土地区土钉墙的施工提出了几点建议:注意排水、规范施工、动态设计以及信息化施工。
2.
Through discussion on pipe material determination,optimization design,through fault,formation treatment,standard construction,which hope to enhance recognition of large diameter pipeline engineering design and execution attentions and adopted measures and enhance large diameter pipeline engineering quality.
介绍了上海市南汇区航头水厂扩建工程的配套输水管线的设计与工程实施中的体会,通过工程具体实施中的管材确定、优化设计、穿越障碍、地基处理、规范施工的论述,以期提高对大口径管线工程设计与实施中的注意事项与采取措施的重视,提高大口径管线工程质量。
6) construction range
施工范围
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条