说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 规范化施工
1)  normalized construction
规范化施工
1.
This paper expounds the features of the tunnel construction and the influence of constructors psychology on the construction quality, introduces the normalized construction of the early stage support, focusing on the control of the overexcavation (underexcavation) and the New Austrian Tunneling Method (NATM) used in the construction of the early stage support.
阐述了隧道施工特点及施工人员心态对施工质量产生的影响,介绍了初期支护的规范化施工,重点是围岩开挖中的超欠挖控制及初期支护“新奥法”施工。
2.
Starting from the definition of environment monitoring in the course of highway construction, and connecting with the practice of normalized construction, this paper expounds the control paths for environment monitoring from three aspects of roadbed construction, bridge construction and normalized operation of spoil ground.
从公路施工过程环保监理定义的出发,结合规范化施工实践,从路基施工、桥梁施工及取、弃土场的规范化作业3方面,阐述了环保监理的控制途径,以引起同行重视,并与之共同探讨。
2)  construction specifications
施工规范
3)  construction code
施工规范
1.
Stipulations in relevant construction codes for buildings, and highways, bridges and culverts on the material and performance index of slurry are discussed and analyzed.
讨论分析了建筑和公路桥涵施工规范对泥浆材料和性能指标的规定,指出了泥浆材料和性能指标是与钻孔桩的施工工艺、桩的规格、土层条件以及设计桩侧摩阻力的要求密切相关。
2.
The code takes shield construction codes in Japan and Europe as references.
结合盾构技术及盾构施工规范在我国的发展状况,介绍了《盾构法隧道施工与验收规范》编制背景及编制过程。
4)  standard construction
规范施工
1.
During construction of the earthnail retaining wall a poor drainage was caused by continuous rainfall,rain water entered back the earthnail retaining wall through the underground drains near the foundation pit\'s southern slope,together with non-standard construction methods,hence large areas of collapse have occurred in quite a few earthnail retaining wall and slope under construction.
并对黄土地区土钉墙的施工提出了几点建议:注意排水、规范施工、动态设计以及信息化施工。
2.
Through discussion on pipe material determination,optimization design,through fault,formation treatment,standard construction,which hope to enhance recognition of large diameter pipeline engineering design and execution attentions and adopted measures and enhance large diameter pipeline engineering quality.
介绍了上海市南汇区航头水厂扩建工程的配套输水管线的设计与工程实施中的体会,通过工程具体实施中的管材确定、优化设计、穿越障碍、地基处理、规范施工的论述,以期提高对大口径管线工程设计与实施中的注意事项与采取措施的重视,提高大口径管线工程质量。
5)  design and construction code
设计施工规范
6)  constructive supervising regulation
施工监理规范
补充资料:内部审计工作经常化、系统化和规范化


内部审计工作经常化、系统化和规范化


内部审计工作经常化、系统化和规范化对内部审计工作的总要求,是提高内部审计工作效率,保证内部审计工作质量的客观要求。1.内部审计工作经常化,指建立内部审计工作的正常秩序,经常开展内部审计工作。经常化的主要内容是:①审计机构或审计人员要连续不断地开展审计工作,保持其连续性和稳定性。②审计对象都应受到审计监督:2.内部审计工作系统化,指对内部审计活动的组织、指导、控制和监督等工作的系统化,形成一套完整的内部审计业务和管理制度系统系统化的主要内容是:①从部门到单位都应当设立内部审计机构②建立内部审计准则,使之成为内部审计工作的一般守则.审计少、员必须执行,具有很强的约束力③制定并完善有关内部审计工作的政策、法规、制度、办法,形成统一、协调、配套的内部审计业务和管理工作的政策法规体系。④建立完整的内部审计理论体系,指导内部审计实践活动。3.内部审计工作规范化,指对内部审计工作的原则、程序、方式、质量标准、技术方法、文书档案等都要制定出统一的,可操作的规范要求,做到按规定行事。经济化、系统化和规范化既是内部审计工作的客观要求,也是内部审计工作的发展方间
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条