1) pre-driving rock bolts
预置锚杆
2) embedded anchor bar
预埋锚杆
3) collocation of anchor
锚杆布置
4) anchor rod arrangement
锚杆配置
1.
this paper stresses to discuss the problems concerning earth pressure, anchor rod arrangement, calculating formula of the shearing strength of anchor rod and the stability of the anchored body in the earth anchor rod for deep founda-tion pit support.
本文结合土锚杆深基坑支护的某些实践经验,重点讨论了土锚杆深基坑支护中有关土压力、锚杆配置、锚杆抗剪强度算式及锚固体稳定性问题。
5) preset bolting rope
预置锚索
1.
Under the circumstance that traditional supporting could not ensure safety of surrounding rock,reinforcement technology by non-uniform pipe-style grunting and preset bolting rope were adopted.
介绍了恒源公司矿井二水平下部车场等复合型软岩强烈变形特点,在常规支护难以确保围岩安全的情况下,采取了非均匀管式高压注浆加固和预置锚索支护技术。
6) anchor bar pretightening force
锚杆预紧力
1.
The article elaborated effect of increasing the anchor bar pretightening force to reinforce adjoining rock during the course of heavy fully-excavating laneway anchor bar suppoting.
论述了在大断面综掘巷道锚杆支护施工中,加大锚杆预紧力对加固围岩起到的重要作用,试验得出螺母扭矩与锚杆拉力的关系及影响因素,提出锚杆预紧力不应小于杆体强度的1/2。
补充资料:采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
霹 采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条