说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 预应力长锚杆(索)
1)  Long pretensioned bolt and cable anchor
预应力长锚杆(索)
2)  pre-stressed anchorage
预应力锚索(杆)
1.
It introduces the working law of the construction flow of pre-stressed anchorage and anchorage boring construction and some key technologies in it.
介绍了预应力锚索(杆)施工流程、锚孔钻造成孔施工的工作原理及一些关键技术,针对施工实践中遇到的问题,结合工程实例,阐述了自制松土齿在防止锚孔成孔施工中退钻卡钻问题上的应用,实践证明采用该措施是行之有效的。
3)  Long prestressed anchor cable
预应力长锚索
4)  length of prestress anchor cable
预应力锚索长度
5)  prestressed anchor cables and prestressed anchor bolts
预应力锚索与锚杆
1.
Based on the characteristic of the high stiff slope, the slope with length of 350m may be divided into 3 zones of A, B and C, the slope reinforcement of A zone is combined with prestressed anchor cables and prestressed anchor bolts, the slope reinforcement of B zone is combined bolting and shortcrete, while the slope reinforcement of C .
根据其特点将350 m长的坡段分为A,B,C三个区,分别采取预应力锚索与锚杆加固、挂网喷射混凝土支护和喷射混凝土支护等措施,实践证明,工程治理效果良好。
6)  presterssed anchor cable frame
预应力框架锚索(杆)
补充资料:采用可拆卸预应力锚杆技术进行高层建筑基坑护坡


采用可拆卸预应力锚杆技术进行高层建筑基坑护坡


  霹 采用可拆卸预应力锚杆技术进行高层建筑基坑护坡
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条